IAC Assessment: WI0421
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0421
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Stainless Tubing
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $50,000,000-$100,000,000
# of Employees 190
Plant Area (Sq.Ft.) 90,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,729 7,685,000 kWh $0.03
Electricity Demand $141,823 40,028 kW-months/year $3.54
Electricity Fees $22,719 - $ -
Natural Gas $132,408 120,589 MMBtu $1.10
TOTAL ENERGY COSTS $540,839
RECOMMENDED SAVINGS* $25,659 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,410
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$9,343
Cost:
$1,400
$(-116) (-3,497) $9,459 862 $(-116)
(-3,497)
kWh
$9,459
862
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$7,154
Cost:
$2,688
- - $7,154 652 -
-
kWh
$7,154
652
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,470
Cost:
$600
- - $4,470 405 -
-
kWh
$4,470
405
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,940
Cost:
$500
- - $2,940 268 -
-
kWh
$2,940
268
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,752
Cost:
$8,000
- - $1,752 196 -
-
kWh
$1,752
196
MMBtu
TOTAL RECOMMENDED Savings:
$25,659
Cost:
$13,188
$(-116) (-3,497) $25,775 2,383 $(-116)
(-3,497)
kWh
$25,775
2,383
MMBtu
TOTAL IMPLEMENTED Savings:
$7,410
Cost:
$1,100
- - $7,410 673 -
-
kWh
$7,410
673
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas