Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2003 |
Principal Product | machine Spindles/Slides |
NAICS | 332710 - Machine Shops |
SIC | 3541 - Machine Tools, Metal Cutting Types |
Sales | $10,000,000-$50,000,000 |
# of Employees | 82 |
Plant Area (Sq.Ft.) | 88,000 |
Annual Production | 4,000 Pieces |
Production Hrs. Annual | 6,250 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $59,957 | 1,796,100 | kWh | $0.03 |
Electricity Demand | $52,355 | 4,995 | kW-months/year | $10.48 |
Electricity Fees | $12,803 | - | $ | - |
Natural Gas | $12,492 | 2,017 | MMBtu | $6.19 |
TOTAL ENERGY COSTS | $141,507 | |||
RECOMMENDED SAVINGS* | $12,656 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,147 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS |
Savings: $4,725 Cost: - |
- | - | - | - | - | - | - | - | $4,725 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$4,725 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $3,022 Cost: $10,000 |
- | - | - | - | $(-418) | (-68) | $3,440 | 5,292 | - | - | - | - |
- - kWh |
- - kW-months/year |
$(-418) (-68) MMBtu |
$3,440 5,292 gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,188 Cost: $4,400 |
$2,188 | 62,005 | - | - | - | - | - | - | - | - | - | - |
$2,188 62,005 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $1,188 Cost: $1,000 |
- | - | - | - | - | - | - | - | - | - | $1,188 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
$1,188 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $1,111 Cost: $2,500 |
$1,111 | 31,472 | - | - | - | - | - | - | - | - | - | - |
$1,111 31,472 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $422 Cost: $640 |
$296 | 8,393 | $126 | 11 | - | - | - | - | - | - | - | - |
$296 8,393 kWh |
$126 11 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,656 Cost: $18,540 |
$3,595 | 101,870 | $126 | 11 | $(-418) | (-68) | $3,440 | 5,292 | $4,725 | - | $1,188 | - | $3,595 101,870 kWh |
$126 11 kW-months/year |
$(-418) (-68) MMBtu |
$3,440 5,292 gal |
$4,725 - $ |
$1,188 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,147 Cost: $640 |
$296 | 8,393 | $126 | 11 | - | - | - | - | $4,725 | - | - | - | $296 8,393 kWh |
$126 11 kW-months/year |
- - MMBtu |
- - gal |
$4,725 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Administrative Changes | Ancillary Material Cost |