Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2004
Principal Product Silica Sand
NAICS 327991 - Cut Stone and Stone Product Manufacturing
SIC 3281 - Cut Stone And Stone Products
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 1,000,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,601 4,194,000 kWh $0.03
Electricity Demand $90,095 8,682 kW-months/year $10.38
Electricity Fees $12,415 - $ -
Natural Gas $496,060 96,173 MMBtu $5.16
TOTAL ENERGY COSTS $739,171
RECOMMENDED SAVINGS* $85,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,464
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$65,381
Cost:
$260,000
$40,440 1,200,000 $52,320 4,800 $(-27,379) (-5,306) - - - - $40,440
1,200,000
kWh
$52,320
4,800
kW-months/year
$(-27,379)
(-5,306)
MMBtu
-
-
Tgal
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,848
Cost:
$6,708
$4,839 143,605 $3,009 276 - - - - - - $4,839
143,605
kWh
$3,009
276
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,616
Cost:
$17,980
$6,616 196,329 - - - - - - - - $6,616
196,329
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 3.3132 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL Savings:
$5,350
Cost:
$10,000
- - - - - - $6,000 - $(-650) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,000
-
Tgal
$(-650)
-
$
TOTAL RECOMMENDED Savings:
$85,195
Cost:
$294,688
$51,895 1,539,934 $55,329 5,076 $(-27,379) (-5,306) $6,000 - $(-650) - $51,895
1,539,934
kWh
$55,329
5,076
kW-months/year
$(-27,379)
(-5,306)
MMBtu
$6,000
-
Tgal
$(-650)
-
$
TOTAL IMPLEMENTED Savings:
$14,464
Cost:
$24,688
$11,455 339,934 $3,009 276 - - - - - - $11,455
339,934
kWh
$3,009
276
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes