IAC Assessment: WM0016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2012
Principal Product Cable harnesses and Integrated structures
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3469 - Metal Stampings, Nec
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 78,000
Annual Production 21,210 Pieces
Production Hrs. Annual 8,640
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,152 1,252,200 kWh $0.07
Electricity Demand $38,422 3,384 kW-months/year $11.35
Electricity Fees $16,814 - $ -
Natural Gas $12,247 1,763 MMBtu $6.95
TOTAL ENERGY COSTS $150,635
RECOMMENDED SAVINGS* $12,483 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,521
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,622
Cost:
$488
$2,930 44,113 $692 61 - - - - $2,930
44,113
kWh
$692
61
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$652
Cost:
$850
$514 7,740 $138 12 - - - - $514
7,740
kWh
$138
12
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,517
Cost:
-
$1,324 19,939 $193 17 - - - - $1,324
19,939
kWh
$193
17
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$957
Cost:
$270
$775 11,678 $182 16 - - - - $775
11,678
kWh
$182
16
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$2,769
Cost:
$13,000
- - - - $2,769 399 - - -
-
kWh
-
-
kW-months/year
$2,769
399
MMBtu
-
-
lb
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$2,004
Cost:
-
- - - - - - $2,004 16 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,004
16
lb
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$962
Cost:
$5,000
- - - - - - $962 16 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$962
16
lb
TOTAL RECOMMENDED Savings:
$12,483
Cost:
$19,608
$5,543 83,470 $1,205 106 $2,769 399 $2,966 31 $5,543
83,470
kWh
$1,205
106
kW-months/year
$2,769
399
MMBtu
$2,966
31
lb
TOTAL IMPLEMENTED Savings:
$3,521
Cost:
-
$1,324 19,939 $193 17 - - $2,004 16 $1,324
19,939
kWh
$193
17
kW-months/year
-
-
MMBtu
$2,004
16
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)