Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2012 |
Principal Product | Cable harnesses and Integrated structures |
NAICS | 334419 - Other Electronic Component Manufacturing |
SIC | 3469 - Metal Stampings, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 260 |
Plant Area (Sq.Ft.) | 78,000 |
Annual Production | 21,210 Pieces |
Production Hrs. Annual | 8,640 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $83,152 | 1,252,200 | kWh | $0.07 |
Electricity Demand | $38,422 | 3,384 | kW-months/year | $11.35 |
Electricity Fees | $16,814 | - | $ | - |
Natural Gas | $12,247 | 1,763 | MMBtu | $6.95 |
TOTAL ENERGY COSTS | $150,635 | |||
RECOMMENDED SAVINGS* | $12,483 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,521 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,622 Cost: $488 |
$2,930 | 44,113 | $692 | 61 | - | - | - | - |
$2,930 44,113 kWh |
$692 61 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $652 Cost: $850 |
$514 | 7,740 | $138 | 12 | - | - | - | - |
$514 7,740 kWh |
$138 12 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $1,517 Cost: - |
$1,324 | 19,939 | $193 | 17 | - | - | - | - |
$1,324 19,939 kWh |
$193 17 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $957 Cost: $270 |
$775 | 11,678 | $182 | 16 | - | - | - | - |
$775 11,678 kWh |
$182 16 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $2,769 Cost: $13,000 |
- | - | - | - | $2,769 | 399 | - | - |
- - kWh |
- - kW-months/year |
$2,769 399 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $2,004 Cost: - |
- | - | - | - | - | - | $2,004 | 16 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,004 16 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $962 Cost: $5,000 |
- | - | - | - | - | - | $962 | 16 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$962 16 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,483 Cost: $19,608 |
$5,543 | 83,470 | $1,205 | 106 | $2,769 | 399 | $2,966 | 31 | $5,543 83,470 kWh |
$1,205 106 kW-months/year |
$2,769 399 MMBtu |
$2,966 31 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,521 Cost: - |
$1,324 | 19,939 | $193 | 17 | - | - | $2,004 | 16 | $1,324 19,939 kWh |
$193 17 kW-months/year |
- - MMBtu |
$2,004 16 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |