Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2013 |
Principal Product | gas cylindar neck rings and sleeves |
NAICS | 332322 - Sheet Metal Work Manufacturing |
SIC | 3444 - Sheet Metalwork |
Sales | $1,000,000-$5,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 33,000 |
Annual Production | 60,000 Pieces |
Production Hrs. Annual | 4,080 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $61,744 | 900,536 | kWh | $0.07 |
Electricity Demand | $34,573 | 3,045 | kW-months/year | $11.35 |
Electricity Fees | $12,892 | - | $ | - |
Natural Gas | $50,663 | 8,433 | MMBtu | $6.01 |
TOTAL ENERGY COSTS | $167,804 | |||
RECOMMENDED SAVINGS* | $15,764 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,150 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,135 Cost: $6,210 |
$947 | 13,811 | $238 | 21 | - | - | $1,950 | - |
$947 13,811 kWh |
$238 21 kW-months/year |
- - MMBtu |
$1,950 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $915 Cost: - |
$632 | 9,209 | $283 | 25 | - | - | - | - |
$632 9,209 kWh |
$283 25 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $1,791 Cost: $1,350 |
- | - | - | - | $1,791 | 286 | - | - |
- - kWh |
- - kW-months/year |
$1,791 286 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,985 Cost: $763 |
- | - | - | - | $1,985 | 331 | - | - |
- - kWh |
- - kW-months/year |
$1,985 331 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,444 Cost: $510 |
$5,136 | 74,865 | $2,308 | 203 | - | - | - | - |
$5,136 74,865 kWh |
$2,308 203 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7495 INSTALL REPLACEMENT DOORS |
Savings: $494 Cost: $1,300 |
- | - | - | - | $494 | 82 | - | - |
- - kWh |
- - kW-months/year |
$494 82 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $15,764 Cost: $10,133 |
$6,715 | 97,885 | $2,829 | 249 | $4,270 | 699 | $1,950 | - | $6,715 97,885 kWh |
$2,829 249 kW-months/year |
$4,270 699 MMBtu |
$1,950 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,150 Cost: $1,860 |
$5,768 | 84,074 | $2,591 | 228 | $1,791 | 286 | - | - | $5,768 84,074 kWh |
$2,591 228 kW-months/year |
$1,791 286 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Increase in Production |