IAC logo
IAC Assessment: WM0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2013
Principal Product Heavy Metal Fabrication
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 275
Plant Area (Sq.Ft.) 212,000
Annual Production 0 Units
Production Hrs. Annual 4,160
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $216,375 3,912,062 kWh $0.06
Electricity Demand $108,941 13,706 kW-months/year $7.95
Electricity Fees $33,435 - $ -
Natural Gas $164,550 35,087 MMBtu $4.69
TOTAL ENERGY COSTS $556,084
RECOMMENDED SAVINGS* $40,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,534
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$24,320
Cost:
$57,920
- - - - $24,320 5,287 - - -
-
kWh
-
-
kW-months/year
$24,320
5,287
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,046
Cost:
-
- - $2,046 257 - - - - -
-
kWh
$2,046
257
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$617
Cost:
-
$434 6,921 $183 23 - - - - $434
6,921
kWh
$183
23
kW-months/year
-
-
MMBtu
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,441
Cost:
$5,000
- - - - - - $4,441 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,441
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$93
Cost:
$315
$93 1,486 - - - - - - $93
1,486
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,383
Cost:
$3,066
$2,465 39,288 $918 115 - - - - $2,465
39,288
kWh
$918
115
kW-months/year
-
-
MMBtu
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$204
Cost:
$273
$204 3,257 - - - - - - $204
3,257
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$5,500
Cost:
$1,860
- - - - - - $5,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,500
-
$
TOTAL RECOMMENDED Savings:
$40,604
Cost:
$68,434
$3,196 50,952 $3,147 395 $24,320 5,287 $9,941 - $3,196
50,952
kWh
$3,147
395
kW-months/year
$24,320
5,287
MMBtu
$9,941
-
$
TOTAL IMPLEMENTED Savings:
$4,534
Cost:
$5,315
$93 1,486 - - - - $4,441 - $93
1,486
kWh
-
-
kW-months/year
-
-
MMBtu
$4,441
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes