IAC logo
IAC Assessment: WM0038
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0038
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2014
Principal Product wireforms and stamping
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 80,000
Annual Production 0 Units
Production Hrs. Annual 5,228
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,868 685,440 kWh $0.06
Electricity Demand $22,253 2,618 kW-months/year $8.50
Natural Gas $15,959 3,071 MMBtu $5.20
TOTAL ENERGY COSTS $82,080
RECOMMENDED SAVINGS* $14,393 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,958
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,700
Cost:
$16,042
$3,581 55,967 $1,119 132 - - $3,581
55,967
kWh
$1,119
132
kW-months/year
-
-
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$172
Cost:
$73
- - - - $172 33 -
-
kWh
-
-
kW-months/year
$172
33
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,678
Cost:
$1,768
$5,678 84,329 - - - - $5,678
84,329
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$622
Cost:
$500
$542 6,465 $80 9 - - $542
6,465
kWh
$80
9
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$637
Cost:
$1,519
$637 6,011 - - - - $637
6,011
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$965
Cost:
$880
- - - - $965 167 -
-
kWh
-
-
kW-months/year
$965
167
MMBtu
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$151
Cost:
$105
- - - - $151 29 -
-
kWh
-
-
kW-months/year
$151
29
MMBtu
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,319
Cost:
-
$1,319 20,608 - - - - $1,319
20,608
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$149
Cost:
$460
$149 2,327 - - - - $149
2,327
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$14,393
Cost:
$21,347
$11,906 175,707 $1,199 141 $1,288 229 $11,906
175,707
kWh
$1,199
141
kW-months/year
$1,288
229
MMBtu
TOTAL IMPLEMENTED Savings:
$11,958
Cost:
$20,362
$10,587 155,099 $1,199 141 $172 33 $10,587
155,099
kWh
$1,199
141
kW-months/year
$172
33
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas