IAC logo
IAC Assessment: WM0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2014
Principal Product Refurbished Fire Fighting Apparatus
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 43,957
Annual Production 125 Units
Production Hrs. Annual 4,880
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,417 931,680 kWh $0.06
Electricity Demand $32,132 2,816 kW-months/year $11.41
Electricity Fees $9,586 - $ -
Natural Gas $25,989 3,485 MMBtu $7.46
TOTAL ENERGY COSTS $128,124
RECOMMENDED SAVINGS* $11,572 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,486
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,140
Cost:
$2,510
$539 8,796 - - - - $601 - $539
8,796
kWh
-
-
kW-months/year
-
-
MMBtu
$601
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$330
Cost:
$100
$330 5,087 - - - - - - $330
5,087
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$6,061
Cost:
$28,350
$(-548) (-8,460) - - $6,609 886 - - $(-548)
(-8,460)
kWh
-
-
kW-months/year
$6,609
886
MMBtu
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,025
Cost:
$868
$1,055 16,287 $970 85 - - - - $1,055
16,287
kWh
$970
85
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,016
Cost:
$7,200
$1,407 21,707 $609 53 - - - - $1,407
21,707
kWh
$609
53
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,572
Cost:
$39,028
$2,783 43,417 $1,579 138 $6,609 886 $601 - $2,783
43,417
kWh
$1,579
138
kW-months/year
$6,609
886
MMBtu
$601
-
$
TOTAL IMPLEMENTED Savings:
$3,486
Cost:
$9,810
$2,276 35,590 $609 53 - - $601 - $2,276
35,590
kWh
$609
53
kW-months/year
-
-
MMBtu
$601
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost