IAC logo
IAC Assessment: WM0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2014
Principal Product compact construction equipment
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 405,000
Annual Production 46,000 Pieces
Production Hrs. Annual 6,240
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $751,712 11,815,579 kWh $0.06
Electricity Demand $331,140 25,953 kW-months/year $12.76
Natural Gas $502,679 81,651 MMBtu $6.16
TOTAL ENERGY COSTS $1,647,225
RECOMMENDED SAVINGS* $136,181 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,004
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$46,648
Cost:
$27,260
$33,659 529,227 $12,989 1,018 - - $33,659
529,227
kWh
$12,989
1,018
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$15,358
Cost:
$6,250
$11,084 174,283 $4,274 335 - - $11,084
174,283
kWh
$4,274
335
kW-months/year
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,736
Cost:
$800
- - - - $2,736 445 -
-
kWh
-
-
kW-months/year
$2,736
445
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,050
Cost:
$225
$9,414 148,020 $3,636 285 - - $9,414
148,020
kWh
$3,636
285
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,680
Cost:
$3,200
$1,477 23,224 $3,203 251 - - $1,477
23,224
kWh
$3,203
251
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,680
Cost:
$5,175
$5,908 92,898 $12,772 1,001 - - $5,908
92,898
kWh
$12,772
1,001
kW-months/year
-
-
MMBtu
07: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$9,345
Cost:
$35,000
- - - - $9,345 1,523 -
-
kWh
-
-
kW-months/year
$9,345
1,523
MMBtu
08: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$14,378
Cost:
$3,000
$14,378 226,067 - - - - $14,378
226,067
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.1224 REPLACE BOILER Savings:
$11,306
Cost:
$16,000
- - - - $11,306 1,827 -
-
kWh
-
-
kW-months/year
$11,306
1,827
MMBtu
TOTAL RECOMMENDED Savings:
$136,181
Cost:
$96,910
$75,920 1,193,719 $36,874 2,890 $23,387 3,795 $75,920
1,193,719
kWh
$36,874
2,890
kW-months/year
$23,387
3,795
MMBtu
TOTAL IMPLEMENTED Savings:
$71,004
Cost:
$43,485
$43,073 677,247 $16,625 1,303 $11,306 1,827 $43,073
677,247
kWh
$16,625
1,303
kW-months/year
$11,306
1,827
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas