Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2015
Principal Product Wood/Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 39
Plant Area (Sq.Ft.) 56,000
Annual Production 17,000 Thousand Feet
Production Hrs. Annual 2,550
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,099 1,915,600 kWh $0.08
Electricity Demand $70,016 8,752 kW-months/year $8.00
Electricity Fees $20,003 - $ -
Natural Gas $1,235 98 MMBtu $12.66
TOTAL ENERGY COSTS $246,154
RECOMMENDED SAVINGS* $21,066 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,117
Cost:
-
$4,754 62,762 $2,363 295 - - $4,754
62,762
kWh
$2,363
295
kW-months/year
-
-
Tgal
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,544
Cost:
$15,210
$5,538 73,108 $2,006 251 - - $5,538
73,108
kWh
$2,006
251
kW-months/year
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,119
Cost:
$8,723
$2,119 30,978 - - - - $2,119
30,978
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,228
Cost:
$1,530
$1,488 19,645 $740 92 - - $1,488
19,645
kWh
$740
92
kW-months/year
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,401
Cost:
$520
$1,029 13,577 $372 47 - - $1,029
13,577
kWh
$372
47
kW-months/year
-
-
Tgal
06: 3.4155 METER WASTE WATER Savings:
$658
Cost:
$750
- - - - $658 116 -
-
kWh
-
-
kW-months/year
$658
116
Tgal
TOTAL RECOMMENDED Savings:
$21,066
Cost:
$26,733
$14,927 200,070 $5,481 685 $658 116 $14,927
200,070
kWh
$5,481
685
kW-months/year
$658
116
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal