Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2015
Principal Product Slitting, Edging, Hardening and Tempering Steel Strip
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 65,000
Annual Production 10,000,000 Pounds
Production Hrs. Annual 6,250
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,567 2,541,000 kWh $0.07
Electricity Demand $83,115 6,420 kW-months/year $12.95
Natural Gas $114,047 20,343 MMBtu $5.61
TOTAL ENERGY COSTS $386,729
RECOMMENDED SAVINGS* $53,860 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,138
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$687
Cost:
$1,950
$687 10,000 - - - - $687
10,000
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,641
Cost:
$8,621
$3,656 53,222 $985 76 - - $3,656
53,222
kWh
$985
76
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,350
Cost:
-
$1,852 26,952 $498 39 - - $1,852
26,952
kWh
$498
39
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,497
Cost:
$1,640
$2,755 40,105 $742 57 - - $2,755
40,105
kWh
$742
57
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,738
Cost:
$8,210
$3,733 54,334 $1,005 78 - - $3,733
54,334
kWh
$1,005
78
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,868
Cost:
$3,500
$4,625 67,127 $1,243 96 - - $4,625
67,127
kWh
$1,243
96
kW-months/year
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,151
Cost:
$1,631
- - - - $11,151 1,987 -
-
kWh
-
-
kW-months/year
$11,151
1,987
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$20,928
Cost:
$34,000
- - - - $20,928 3,730 -
-
kWh
-
-
kW-months/year
$20,928
3,730
MMBtu
TOTAL RECOMMENDED Savings:
$53,860
Cost:
$59,552
$17,308 251,740 $4,473 345 $32,079 5,717 $17,308
251,740
kWh
$4,473
345
kW-months/year
$32,079
5,717
MMBtu
TOTAL IMPLEMENTED Savings:
$8,138
Cost:
$10,261
$6,412 93,327 $1,726 133 - - $6,412
93,327
kWh
$1,726
133
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas