IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2015
Principal Product Silicone and plastic molded parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 52,000
Annual Production 9,442,168 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,922 2,242,553 kWh $0.04
Electricity Demand $33,385 5,478 kW-months/year $6.09
Electricity Fees $61,234 - $ -
Natural Gas $7,610 1,312 MMBtu $5.80
TOTAL ENERGY COSTS $210,590
RECOMMENDED SAVINGS* $35,114 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,668
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,059
Cost:
$84,720
$12,851 313,505 $14,209 2,332 - - - - - - $12,851
313,505
kWh
$14,209
2,332
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,804
Cost:
$1,526
- - - - $1,804 311 - - - - -
-
kWh
-
-
kW-months/year
$1,804
311
MMBtu
-
-
Tgal
-
-
lb
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$503
Cost:
-
- - - - $503 87 - - - - -
-
kWh
-
-
kW-months/year
$503
87
MMBtu
-
-
Tgal
-
-
lb
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,258
Cost:
$5,000
- - - - - - - - $1,258 17,034 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,258
17,034
lb
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,255
Cost:
$1,348
$1,255 30,627 - - - - - - - - $1,255
30,627
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$513
Cost:
$550
$403 9,847 $110 18 - - - - - - $403
9,847
kWh
$110
18
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$447
Cost:
-
$447 10,902 - - - - - - - - $447
10,902
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$401
Cost:
$55
$401 9,783 - - - - - - - - $401
9,783
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$392
Cost:
$84
- - - - $392 68 - - - - -
-
kWh
-
-
kW-months/year
$392
68
MMBtu
-
-
Tgal
-
-
lb
10: 2.7134 USE PHOTOCELL CONTROLS Savings:
$371
Cost:
$600
$136 3,329 $234 38 - - - - - - $136
3,329
kWh
$234
38
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$282
Cost:
$70
$188 4,608 $94 15 - - - - - - $188
4,608
kWh
$94
15
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
12: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$491
Cost:
$75
$378 9,226 $112 18 - - - - - - $378
9,226
kWh
$112
18
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
13: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$195
Cost:
$56
$158 3,849 $37 6 - - - - - - $158
3,849
kWh
$37
6
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
14: 3.4155 METER WASTE WATER Savings:
$144
Cost:
$375
- - - - - - $144 76 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$144
76
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$35,114
Cost:
$94,459
$16,218 395,676 $14,795 2,428 $2,699 465 $144 76 $1,258 17,034 $16,218
395,676
kWh
$14,795
2,428
kW-months/year
$2,699
465
MMBtu
$144
76
Tgal
$1,258
17,034
lb
TOTAL IMPLEMENTED Savings:
$1,668
Cost:
$229
$567 13,834 $206 34 $895 154 - - - - $567
13,834
kWh
$206
34
kW-months/year
$895
154
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)