IAC logo
IAC Assessment: WM0070
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2015
Principal Product Bread rolls and donuts
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 79,500
Annual Production 73,660,240 Pounds
Production Hrs. Annual 6,575
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $402,841 6,394,970 kWh $0.06
Electricity Demand $128,611 11,336 kW-months/year $11.35
Electricity Fees $30,430 - $ -
Natural Gas $420,823 70,421 MMBtu $5.98
TOTAL ENERGY COSTS $1,010,887
RECOMMENDED SAVINGS* $79,203 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,867
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,528
Cost:
$44,678
$24,811 393,819 $6,135 541 - - $1,582 - $24,811
393,819
kWh
$6,135
541
kW-months/year
-
-
MMBtu
$1,582
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$22,791
Cost:
$20,960
$(-728) (-11,563) - - $23,519 4,054 - - $(-728)
(-11,563)
kWh
-
-
kW-months/year
$23,519
4,054
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,447
Cost:
$520
$8,376 132,948 $2,071 183 - - - - $8,376
132,948
kWh
$2,071
183
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,545
Cost:
$6,320
- - - - $4,545 760 - - -
-
kWh
-
-
kW-months/year
$4,545
760
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,580
Cost:
$570
$2,069 32,847 $510 45 - - - - $2,069
32,847
kWh
$510
45
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,279
Cost:
$5,355
$2,279 36,167 - - - - - - $2,279
36,167
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,169
Cost:
$995
$1,738 27,601 $431 38 - - - - $1,738
27,601
kWh
$431
38
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,038
Cost:
$1,190
$828 13,211 $210 19 - - - - $828
13,211
kWh
$210
19
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$828
Cost:
$94
- - - - $828 139 - - -
-
kWh
-
-
kW-months/year
$828
139
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$79,203
Cost:
$80,682
$39,372 625,030 $9,357 825 $28,892 4,953 $1,582 - $39,372
625,030
kWh
$9,357
825
kW-months/year
$28,892
4,953
MMBtu
$1,582
-
$
TOTAL IMPLEMENTED Savings:
$51,867
Cost:
$53,402
$40,100 636,593 $9,357 825 $828 139 $1,582 - $40,100
636,593
kWh
$9,357
825
kW-months/year
$828
139
MMBtu
$1,582
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes