IAC logo
IAC Assessment: WM0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2015
Principal Product Stone veneer
NAICS 212311 - Dimension Stone Mining and Quarrying
SIC 1411 - Dimension Stone
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 65,000
Annual Production 110,000 Tons
Production Hrs. Annual 4,590
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,043 2,283,535 kWh $0.07
Electricity Demand $55,065 5,953 kW-months/year $9.25
LPG $100,170 10,642 MMBtu $9.41
TOTAL ENERGY COSTS $308,278
RECOMMENDED SAVINGS* $17,368 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,380
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,713
Cost:
$20,000
$7,137 106,529 $2,576 279 - - - - $7,137
106,529
kWh
$2,576
279
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,865
Cost:
$3,846
$1,981 29,564 $677 73 - - $207 - $1,981
29,564
kWh
$677
73
kW-months/year
-
-
MMBtu
$207
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,288
Cost:
$6,900
$1,893 45,384 - - - - $395 - $1,893
45,384
kWh
-
-
kW-months/year
-
-
MMBtu
$395
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,227
Cost:
$575
$1,227 18,309 - - - - - - $1,227
18,309
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,054
Cost:
$1,390
- - - - $1,054 112 - - -
-
kWh
-
-
kW-months/year
$1,054
112
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$221
Cost:
$476
$221 3,299 - - - - - - $221
3,299
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$17,368
Cost:
$33,187
$12,459 203,085 $3,253 352 $1,054 112 $602 - $12,459
203,085
kWh
$3,253
352
kW-months/year
$1,054
112
MMBtu
$602
-
$
TOTAL IMPLEMENTED Savings:
$6,380
Cost:
$11,321
$5,101 93,257 $677 73 - - $602 - $5,101
93,257
kWh
$677
73
kW-months/year
-
-
MMBtu
$602
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost