IAC logo
IAC Assessment: WM0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2017
Principal Product Treat Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 10
Plant Area (Sq.Ft.) 47,810
Annual Production 80,001 Units
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,723 2,508,775 kWh $0.06
Electricity Demand $39,107 4,650 kW-months/year $8.41
Electricity Fees $28,238 - $ -
Natural Gas $18,845 2,901 MMBtu $6.50
TOTAL ENERGY COSTS $236,913
RECOMMENDED SAVINGS* $105,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,432
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$68,853
Cost:
$480,000
$64,386 1,071,671 - - $4,467 687 $64,386
1,071,671
kWh
-
-
kW-months/year
$4,467
687
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,721
Cost:
$49,500
$12,721 165,432 - - - - $12,721
165,432
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,613
Cost:
$11,130
$10,613 146,785 - - - - $10,613
146,785
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,352
Cost:
$3,278
$4,352 52,749 - - - - $4,352
52,749
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,204
Cost:
-
- - - - $2,204 339 -
-
kWh
-
-
kW-months/year
$2,204
339
MMBtu
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,915
Cost:
$11,475
$1,915 22,137 - - - - $1,915
22,137
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$1,605
Cost:
-
$535 8,902 $1,070 127 - - $535
8,902
kWh
$1,070
127
kW-months/year
-
-
MMBtu
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,133
Cost:
$3,818
- - - - $2,133 328 -
-
kWh
-
-
kW-months/year
$2,133
328
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,138
Cost:
$600
$1,138 15,651 - - - - $1,138
15,651
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$416
Cost:
$800
$87 1,456 $329 39 - - $87
1,456
kWh
$329
39
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$105,950
Cost:
$560,601
$95,747 1,484,783 $1,398 166 $8,804 1,354 $95,747
1,484,783
kWh
$1,398
166
kW-months/year
$8,804
1,354
MMBtu
TOTAL IMPLEMENTED Savings:
$11,432
Cost:
$7,696
$6,025 77,302 $1,070 127 $4,337 667 $6,025
77,302
kWh
$1,070
127
kW-months/year
$4,337
667
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas