IAC logo
IAC Assessment: WM0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2017
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $100,000,000-$500,000,000
# of Employees 232
Plant Area (Sq.Ft.) 6,534,000
Annual Production 70,000,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $553,695 10,078,025 kWh $0.05
Electricity Demand $304,323 23,467 kW-months/year $12.97
Electricity Fees $10,546 - $ -
Natural Gas $519,050 133,393 MMBtu $3.89
TOTAL ENERGY COSTS $1,387,614
RECOMMENDED SAVINGS* $107,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $86,995
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$47,713
Cost:
$150,000
$16,081 292,704 $31,632 2,439 $16,081
292,704
kWh
$31,632
2,439
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,077
Cost:
$29,868
$9,710 176,476 $6,367 491 $9,710
176,476
kWh
$6,367
491
kW-months/year
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$12,320
Cost:
-
$7,470 135,954 $4,850 374 $7,470
135,954
kWh
$4,850
374
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,947
Cost:
$460
$8,805 121,112 $2,142 166 $8,805
121,112
kWh
$2,142
166
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,535
Cost:
$3,553
$5,176 94,218 $3,359 259 $5,176
94,218
kWh
$3,359
259
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,480
Cost:
$14,400
$7,480 117,892 - - $7,480
117,892
kWh
-
-
kW-months/year
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,426
Cost:
$1,430
$3,556 49,055 $870 67 $3,556
49,055
kWh
$870
67
kW-months/year
TOTAL RECOMMENDED Savings:
$107,498
Cost:
$199,711
$58,278 987,411 $49,220 3,796 $58,278
987,411
kWh
$49,220
3,796
kW-months/year
TOTAL IMPLEMENTED Savings:
$86,995
Cost:
$168,413
$45,012 761,880 $41,983 3,238 $45,012
761,880
kWh
$41,983
3,238
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand