IAC logo
IAC Assessment: WM0113
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2017
Principal Product Beverage dispensing and refrigeration products
NAICS 333241 - Food Product Machinery Manufacturing
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 290
Plant Area (Sq.Ft.) 300,000
Annual Production 1,100,000 Pieces
Production Hrs. Annual 4,896
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $303,952 4,926,321 kWh $0.06
Electricity Demand $130,238 9,634 kW-months/year $13.52
Electricity Fees $23,428 - $ -
Natural Gas $75,299 14,245 MMBtu $5.29
TOTAL ENERGY COSTS $532,917
RECOMMENDED SAVINGS* $50,282 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,921
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$21,176
Cost:
$32,727
$13,781 223,302 $7,395 547 - - $13,781
223,302
kWh
$7,395
547
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,921
Cost:
$18,856
$11,013 178,429 $5,908 437 - - $11,013
178,429
kWh
$5,908
437
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,755
Cost:
$3,309
$2,335 37,941 $2,420 179 - - $2,335
37,941
kWh
$2,420
179
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,437
Cost:
$3,721
$1,382 22,298 $2,055 152 - - $1,382
22,298
kWh
$2,055
152
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,074
Cost:
-
$1,452 23,491 $1,622 120 - - $1,452
23,491
kWh
$1,622
120
kW-months/year
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$684
Cost:
$1,000
- - - - $684 129 -
-
kWh
-
-
kW-months/year
$684
129
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$235
Cost:
$800
$154 2,425 $81 6 - - $154
2,425
kWh
$81
6
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$50,282
Cost:
$60,413
$30,117 487,886 $19,481 1,441 $684 129 $30,117
487,886
kWh
$19,481
1,441
kW-months/year
$684
129
MMBtu
TOTAL IMPLEMENTED Savings:
$16,921
Cost:
$18,856
$11,013 178,429 $5,908 437 - - $11,013
178,429
kWh
$5,908
437
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas