IAC Assessment: WM0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2018
Principal Product sewage
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 22
Plant Area (Sq.Ft.) 1,265,000
Annual Production 7,665,000 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,821 6,271,183 kWh $0.05
Electricity Demand $202,661 14,991 kW-months/year $13.52
Electricity Fees $39,261 - $ -
Natural Gas $95,187 19,079 MMBtu $4.99
TOTAL ENERGY COSTS $636,930
RECOMMENDED SAVINGS* $94,986 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,972
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$61,350
Cost:
$196,482
$61,350 1,283,173 - - - - - - $61,350
1,283,173
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,182
Cost:
$22,000
- - - - $14,182 2,843 - - -
-
kWh
-
-
kW-months/year
$14,182
2,843
MMBtu
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$6,742
Cost:
-
- - - - $6,742 1,351 - - -
-
kWh
-
-
kW-months/year
$6,742
1,351
MMBtu
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,335
Cost:
-
- - - - $4,335 869 - - -
-
kWh
-
-
kW-months/year
$4,335
869
MMBtu
-
-
$
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,420
Cost:
$4,800
- - - - $3,420 686 - - -
-
kWh
-
-
kW-months/year
$3,420
686
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,531
Cost:
$4,972
$1,531 32,016 - - - - - - $1,531
32,016
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,042
Cost:
$2,808
$977 20,441 $65 5 - - - - $977
20,441
kWh
$65
5
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$867
Cost:
$1,960
$867 17,170 - - - - - - $867
17,170
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$865
Cost:
$625
$623 13,038 $242 18 - - - - $623
13,038
kWh
$242
18
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$455
Cost:
$830
$220 4,599 $85 6 - - $150 - $220
4,599
kWh
$85
6
kW-months/year
-
-
MMBtu
$150
-
$
11: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$197
Cost:
$327
- - - - $197 39 - - -
-
kWh
-
-
kW-months/year
$197
39
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$94,986
Cost:
$234,804
$65,568 1,370,437 $392 29 $28,876 5,788 $150 - $65,568
1,370,437
kWh
$392
29
kW-months/year
$28,876
5,788
MMBtu
$150
-
$
TOTAL IMPLEMENTED Savings:
$14,972
Cost:
$10,570
$3,595 74,226 $150 11 $11,077 2,220 $150 - $3,595
74,226
kWh
$150
11
kW-months/year
$11,077
2,220
MMBtu
$150
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost