IAC Assessment: WM0121
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0121
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2018
Principal Product Phenolic Resin
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $100,000,000-$500,000,000
# of Employees 280
Plant Area (Sq.Ft.) 450,000
Annual Production 100,000,000 Units
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $847,778 17,108,727 kWh $0.05
Electricity Demand $539,300 39,365 kW-months/year $13.70
Electricity Fees $74,430 - $ -
Natural Gas $929,291 251,406 MMBtu $3.70
TOTAL ENERGY COSTS $2,390,799
RECOMMENDED SAVINGS* $153,531 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $66,686
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$34,154
Cost:
$54,000
- - - - $34,154 9,231 - - -
-
kWh
-
-
kW-months/year
$34,154
9,231
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,043
Cost:
$20,000
$19,990 403,422 $11,054 807 - - - - $19,990
403,422
kWh
$11,054
807
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$25,239
Cost:
$23,000
$18,307 369,460 $6,932 506 - - - - $18,307
369,460
kWh
$6,932
506
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$13,055
Cost:
$52,350
$8,406 169,650 $4,648 339 - - - - $8,406
169,650
kWh
$4,648
339
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$12,568
Cost:
$12,240
$6,870 138,642 $5,698 416 - - - - $6,870
138,642
kWh
$5,698
416
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,644
Cost:
$10,926
$10,644 214,821 - - - - - - $10,644
214,821
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,876
Cost:
$3,060
$4,490 90,609 $2,387 174 - - - - $4,490
90,609
kWh
$2,387
174
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$6,741
Cost:
$7,920
- - - - $6,741 1,822 - - -
-
kWh
-
-
kW-months/year
$6,741
1,822
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,083
Cost:
$4,115
$3,672 74,206 $1,411 103 - - - - $3,672
74,206
kWh
$1,411
103
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,625
Cost:
$2,330
$1,072 21,637 $403 29 - - $150 - $1,072
21,637
kWh
$403
29
kW-months/year
-
-
MMBtu
$150
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,374
Cost:
$2,400
$885 17,851 $489 36 - - - - $885
17,851
kWh
$489
36
kW-months/year
-
-
MMBtu
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,095
Cost:
$1,848
$1,095 21,681 - - - - - - $1,095
21,681
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
13: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,065
Cost:
$1,843
$1,065 21,495 - - - - - - $1,065
21,495
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
14: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$1,060
Cost:
$3,450
$1,060 21,399 - - - - - - $1,060
21,399
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
15: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$838
Cost:
$1,160
$607 12,258 $230 17 - - - - $607
12,258
kWh
$230
17
kW-months/year
-
-
MMBtu
-
-
$
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$799
Cost:
$142
$520 10,404 $279 20 - - - - $520
10,404
kWh
$279
20
kW-months/year
-
-
MMBtu
-
-
$
17: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$273
Cost:
$385
$177 3,548 $96 7 - - - - $177
3,548
kWh
$96
7
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$153,531
Cost:
$201,169
$78,859 1,591,083 $33,627 2,455 $40,895 11,053 $150 - $78,859
1,591,083
kWh
$33,627
2,455
kW-months/year
$40,895
11,053
MMBtu
$150
-
$
TOTAL IMPLEMENTED Savings:
$66,686
Cost:
$60,401
$42,035 847,812 $17,760 1,296 $6,741 1,822 $150 - $42,035
847,812
kWh
$17,760
1,296
kW-months/year
$6,741
1,822
MMBtu
$150
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material