IAC logo
IAC Assessment: WM0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2018
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 10
Plant Area (Sq.Ft.) 1,004,191
Annual Production 2,920,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,183 6,691,080 kWh $0.04
Electricity Demand $126,305 12,217 kW-months/year $10.34
Electricity Fees $6,174 - $ -
Natural Gas $18,059 3,091 MMBtu $5.84
TOTAL ENERGY COSTS $442,721
RECOMMENDED SAVINGS* $29,549 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,310
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$11,827
Cost:
$48,514
$11,827 270,829 - - - - - - $11,827
270,829
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$6,420
Cost:
$5,000
$4,848 111,007 $1,572 152 - - - - $4,848
111,007
kWh
$1,572
152
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,995
Cost:
$4,950
$1,650 37,800 $2,345 227 - - - - $1,650
37,800
kWh
$2,345
227
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,831
Cost:
-
- - - - $2,831 485 - - -
-
kWh
-
-
kW-months/year
$2,831
485
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,722
Cost:
$950
$2,055 47,057 $667 65 - - - - $2,055
47,057
kWh
$667
65
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,581
Cost:
$3,820
- - - - $1,581 271 - - -
-
kWh
-
-
kW-months/year
$1,581
271
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$173
Cost:
$345
$106 2,418 $34 3 - - $33 - $106
2,418
kWh
$34
3
kW-months/year
-
-
MMBtu
$33
-
$
TOTAL RECOMMENDED Savings:
$29,549
Cost:
$63,579
$20,486 469,111 $4,618 447 $4,412 755 $33 - $20,486
469,111
kWh
$4,618
447
kW-months/year
$4,412
755
MMBtu
$33
-
$
TOTAL IMPLEMENTED Savings:
$13,310
Cost:
$11,245
$8,659 198,282 $4,618 447 - - $33 - $8,659
198,282
kWh
$4,618
447
kW-months/year
-
-
MMBtu
$33
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost