IAC logo
IAC Assessment: WM0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2018
Principal Product Stair Lifts
NAICS 333921 - Elevator and Moving Stairway Manufacturing
SIC 3534 - Elevators And Moving Stairways
Sales $100,000,000-$500,000,000
# of Employees 334
Plant Area (Sq.Ft.) 75,000
Annual Production 9,700 Units
Production Hrs. Annual 5,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $206,740 2,856,190 kWh $0.07
Electricity Demand $68,927 7,702 kW-months/year $8.95
Electricity Fees $28,863 - $ -
Natural Gas $34,657 5,662 MMBtu $6.12
TOTAL ENERGY COSTS $339,187
RECOMMENDED SAVINGS* $80,646 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,274
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,391
Cost:
$22,752
$19,698 272,180 $6,693 748 - - $19,698
272,180
kWh
$6,693
748
kW-months/year
-
-
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$20,855
Cost:
$48,500
$20,855 276,867 - - - - $20,855
276,867
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$9,244
Cost:
$6,840
- - - - $9,244 1,538 -
-
kWh
-
-
kW-months/year
$9,244
1,538
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,118
Cost:
$19,300
$9,118 125,970 - - - - $9,118
125,970
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,496
Cost:
$2,000
$6,011 83,034 $1,485 166 - - $6,011
83,034
kWh
$1,485
166
kW-months/year
-
-
MMBtu
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,084
Cost:
-
$1,610 22,241 $474 53 - - $1,610
22,241
kWh
$474
53
kW-months/year
-
-
MMBtu
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,744
Cost:
$5,250
- - - - $1,744 285 -
-
kWh
-
-
kW-months/year
$1,744
285
MMBtu
08: 2.7446 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS Savings:
$1,291
Cost:
$533
- - - - $1,291 211 -
-
kWh
-
-
kW-months/year
$1,291
211
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$804
Cost:
$1,172
$554 7,585 $250 28 - - $554
7,585
kWh
$250
28
kW-months/year
-
-
MMBtu
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$765
Cost:
$600
$765 10,574 - - - - $765
10,574
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$637
Cost:
$740
- - - - $637 104 -
-
kWh
-
-
kW-months/year
$637
104
MMBtu
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$217
Cost:
$200
$163 2,266 $54 6 - - $163
2,266
kWh
$54
6
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$80,646
Cost:
$107,887
$58,774 800,717 $8,956 1,001 $12,916 2,138 $58,774
800,717
kWh
$8,956
1,001
kW-months/year
$12,916
2,138
MMBtu
TOTAL IMPLEMENTED Savings:
$48,274
Cost:
$51,214
$36,991 511,010 $8,902 995 $2,381 389 $36,991
511,010
kWh
$8,902
995
kW-months/year
$2,381
389
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas