IAC logo
IAC Assessment: WM0138
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0138
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2019
Principal Product Silica sand
NAICS 212322 - Industrial Sand Mining
SIC 1446 - Industrial Sand
Sales $1,000,000-$5,000,000
# of Employees 114
Plant Area (Sq.Ft.) 26,136,000
Annual Production 2,700,000 Units
Production Hrs. Annual 8,270
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,761,791 54,125,402 kWh $0.05
Electricity Fees $664,157 - $ -
Natural Gas $2,181,438 524,674 MMBtu $4.16
TOTAL ENERGY COSTS $5,607,386
RECOMMENDED SAVINGS* $422,645 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,286
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$336,174
Cost:
$82,000
- - $336,174 80,850 -
-
kWh
$336,174
80,850
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,481
Cost:
$34,315
$31,481 616,803 - - $31,481
616,803
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,347
Cost:
$29,120
$25,347 496,715 - - $25,347
496,715
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,430
Cost:
$30,453
$9,430 184,788 - - $9,430
184,788
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,068
Cost:
$14,525
$9,068 177,698 - - $9,068
177,698
kWh
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,375
Cost:
$11,900
$6,375 124,931 - - $6,375
124,931
kWh
-
-
MMBtu
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,770
Cost:
-
$4,770 93,484 - - $4,770
93,484
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$422,645
Cost:
$202,313
$86,471 1,694,419 $336,174 80,850 $86,471
1,694,419
kWh
$336,174
80,850
MMBtu
TOTAL IMPLEMENTED Savings:
$47,286
Cost:
$76,668
$47,286 926,522 - - $47,286
926,522
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas