Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2019
Principal Product Low Voltage Electrical Drives
NAICS 335314 - Relay and Industrial Control Manufacturing
SIC 3625 - Relays And Industrial Controls
Sales $100,000,000-$500,000,000
# of Employees 291
Plant Area (Sq.Ft.) 130,000
Annual Production 181,962 Pieces
Production Hrs. Annual 7,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,296 3,656,735 kWh $0.06
Electricity Demand $154,148 11,402 kW-months/year $13.52
Natural Gas $38,178 6,512 MMBtu $5.86
TOTAL ENERGY COSTS $419,622
RECOMMENDED SAVINGS* $44,804 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,508
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$18,432
Cost:
$51,563
$18,432 280,931 - - - - $18,432
280,931
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,984
Cost:
$27,284
$11,726 188,755 $4,259 315 - - $11,726
188,755
kWh
$4,259
315
kW-months/year
-
-
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,570
Cost:
$745
- - - - $2,570 439 -
-
kWh
-
-
kW-months/year
$2,570
439
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,464
Cost:
$1,711
$1,428 22,984 $1,036 77 - - $1,428
22,984
kWh
$1,036
77
kW-months/year
-
-
MMBtu
05: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,941
Cost:
$2,080
$1,427 22,964 $514 38 - - $1,427
22,964
kWh
$514
38
kW-months/year
-
-
MMBtu
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$1,102
Cost:
$230
- - - - $1,102 188 -
-
kWh
-
-
kW-months/year
$1,102
188
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,092
Cost:
-
$801 12,891 $291 22 - - $801
12,891
kWh
$291
22
kW-months/year
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$637
Cost:
$510
$637 10,255 - - - - $637
10,255
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$582
Cost:
$70
$448 7,206 $134 10 - - $448
7,206
kWh
$134
10
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$44,804
Cost:
$84,193
$34,900 545,986 $6,232 461 $3,672 627 $34,900
545,986
kWh
$6,232
461
kW-months/year
$3,672
627
MMBtu
TOTAL IMPLEMENTED Savings:
$35,508
Cost:
$78,847
$30,959 482,577 $4,549 337 - - $30,959
482,577
kWh
$4,549
337
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas