Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: WM0160
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: WM0160
Due to University and State restrictions around the country, all IAC assessment activities are temporarily on hold.
Click here for details about Coronavirus (COVID-19) Recovery Support programs
IAC Center University of Wisconsin, Milwaukee
Assessment Year
Principal Product Mixed Meat & Bone Meal and Tallow
NAICS 311613 - Rendering and Meat Byproduct Processing
SIC 2077 - Animal And Marine Fats And Oils
Sales $100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 160,000
Annual Production 95,000 Tons
Production Hrs. Annual 8,736
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,041,863 23,232,643 kWh $0.04
Electricity Demand $406,359 45,657 kW/month $8.90
Natural Gas $1,846,882 492,502 MMBtu $3.75
TOTAL ENERGY COSTS $4,075,951
RECOMMENDED SAVINGS* $178,083 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW/month $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$142,628
Cost:
$60,000
- - - - $142,628 38,034 -
-
kWh
-
-
kW/month
$142,628
38,034
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$10,840
Cost:
-
$10,840 241,830 - - - - $10,840
241,830
kWh
-
-
kW/month
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,683
Cost:
$10,855
$9,177 204,667 $506 56 - - $9,177
204,667
kWh
$506
56
kW/month
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,267
Cost:
$3,450
$6,479 144,497 $1,788 199 - - $6,479
144,497
kWh
$1,788
199
kW/month
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,847
Cost:
$11,890
$4,063 90,620 $784 87 - - $4,063
90,620
kWh
$784
87
kW/month
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,260
Cost:
$720
$1,194 26,637 $66 7 - - $1,194
26,637
kWh
$66
7
kW/month
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$296
Cost:
$1,631
$232 5,184 $64 7 - - $232
5,184
kWh
$64
7
kW/month
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$261
Cost:
$657
- - - - $261 70 -
-
kWh
-
-
kW/month
$261
70
MMBtu
TOTAL RECOMMENDED Savings:
$178,083
Cost:
$89,203
$31,986 713,435 $3,208 356 $142,889 38,104 $31,986
713,435
kWh
$3,208
356
kW/month
$142,889
38,104
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW/month
-
-
MMBtu
Savings
Cost
$ kWh $ kW/month $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas