Select a Center

Arizona State University
Case Western Reserve University
Colorado School of Mines
Colorado State University
Indiana University-Purdue University
Kennesaw State
Lehigh University
Louisiana State University
Louisiana Tech
Michigan State University
Mississippi State
Oklahoma State University
Oregon State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of California, Irvine
University of Connecticut
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Louisville
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of North Carolina, Charlotte
University of Texas Rio Grande Valley
University of Utah
University of Washington
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: WM0165
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: WM0165
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2021
Principal Product Asphalt Plants
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 62,000
Annual Production 10,000 Pieces
Production Hrs. Annual 3,500
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,191 1,475,400 kWh $0.06
Electricity Demand $107,603 8,138 kW-months/year $13.22
Electricity Fees $20,479 - $ -
Natural Gas $113,507 24,326 MMBtu $4.67
TOTAL ENERGY COSTS $332,780
RECOMMENDED SAVINGS* $43,167 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$23,243
Cost:
$76,150
- - - - $23,243 4,977 -
-
kWh
-
-
kW-months/year
$23,243
4,977
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,709
Cost:
$7,202
$3,014 48,615 $1,695 128 - - $3,014
48,615
kWh
$1,695
128
kW-months/year
-
-
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,846
Cost:
-
$3,846 62,032 - - - - $3,846
62,032
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,552
Cost:
$6,405
- - - - $2,552 547 -
-
kWh
-
-
kW-months/year
$2,552
547
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,370
Cost:
$1,800
$1,518 24,479 $852 65 - - $1,518
24,479
kWh
$852
65
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,324
Cost:
$4,100
$1,012 16,314 - - $1,312 281 $1,012
16,314
kWh
-
-
kW-months/year
$1,312
281
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,598
Cost:
$3,500
$1,009 16,275 $589 45 - - $1,009
16,275
kWh
$589
45
kW-months/year
-
-
MMBtu
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,497
Cost:
-
$1,057 17,059 $440 33 - - $1,057
17,059
kWh
$440
33
kW-months/year
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,028
Cost:
$2,237
$649 10,469 $379 29 - - $649
10,469
kWh
$379
29
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,167
Cost:
$101,394
$12,105 195,243 $3,954 300 $27,107 5,805 $12,105
195,243
kWh
$3,954
300
kW-months/year
$27,107
5,805
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas