IAC logo
IAC Assessment: WM0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2021
Principal Product Paperboard Packaging
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 139
Plant Area (Sq.Ft.) 275,000
Annual Production 225,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $384,174 6,389,618 kWh $0.06
Electricity Demand $266,176 17,530 kW-months/year $15.18
Electricity Fees $60,560 - $ -
Natural Gas $24,485 5,441 MMBtu $4.50
TOTAL ENERGY COSTS $738,448
RECOMMENDED SAVINGS* $69,835 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$26,531
Cost:
-
$15,969 266,148 $5,360 353 $5,202 1,156 $15,969
266,148
kWh
$5,360
353
kW-months/year
$5,202
1,156
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,525
Cost:
$2,725
$11,658 194,274 $5,867 387 - - $11,658
194,274
kWh
$5,867
387
kW-months/year
-
-
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$13,809
Cost:
-
$7,477 124,615 - - $6,332 1,407 $7,477
124,615
kWh
-
-
kW-months/year
$6,332
1,407
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,314
Cost:
$3,500
$3,929 65,483 $1,385 91 - - $3,929
65,483
kWh
$1,385
91
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,512
Cost:
$5,221
$2,224 37,066 $289 19 - - $2,224
37,066
kWh
$289
19
kW-months/year
-
-
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,076
Cost:
$6,500
$(-363) 6,050 - - $2,439 542 $(-363)
6,050
kWh
-
-
kW-months/year
$2,439
542
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,078
Cost:
-
$861 14,343 $217 14 - - $861
14,343
kWh
$217
14
kW-months/year
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$990
Cost:
$1,000
$659 10,975 $331 22 - - $659
10,975
kWh
$331
22
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$69,835
Cost:
$18,946
$42,414 718,954 $13,448 886 $13,973 3,105 $42,414
718,954
kWh
$13,448
886
kW-months/year
$13,973
3,105
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas