IAC logo
IAC Assessment: WM0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 9
Plant Area (Sq.Ft.) 400,000
Annual Production 1 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,818 1,074,450 kWh $0.06
Electricity Demand $31,531 2,077 kW-months/year $15.18
Natural Gas $13,934 2,062 MMBtu $6.76
TOTAL ENERGY COSTS $108,283
RECOMMENDED SAVINGS* $21,650 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,017
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,961
Cost:
$8,440
$5,452 93,996 $1,509 99 - - $5,452
93,996
kWh
$1,509
99
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,050
Cost:
$8,821
$4,314 74,378 $736 49 - - $4,314
74,378
kWh
$736
49
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,934
Cost:
$1,200
$1,783 30,741 $1,151 76 - - $1,783
30,741
kWh
$1,151
76
kW-months/year
-
-
MMBtu
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,034
Cost:
-
- - - - $2,034 301 -
-
kWh
-
-
kW-months/year
$2,034
301
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,794
Cost:
-
$1,141 19,671 $653 43 - - $1,141
19,671
kWh
$653
43
kW-months/year
-
-
MMBtu
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,216
Cost:
-
$880 15,174 $336 22 - - $880
15,174
kWh
$336
22
kW-months/year
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$821
Cost:
$735
$696 12,003 $125 8 - - $696
12,003
kWh
$125
8
kW-months/year
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$716
Cost:
$850
$561 9,678 $155 10 - - $561
9,678
kWh
$155
10
kW-months/year
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$123
Cost:
-
$91 1,564 $33 2 - - $91
1,564
kWh
$33
2
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$21,650
Cost:
$20,046
$14,917 257,205 $4,698 309 $2,034 301 $14,917
257,205
kWh
$4,698
309
kW-months/year
$2,034
301
MMBtu
TOTAL IMPLEMENTED Savings:
$9,017
Cost:
$9,671
$5,755 99,230 $1,228 81 $2,034 301 $5,755
99,230
kWh
$1,228
81
kW-months/year
$2,034
301
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas