IAC Assessment: WM0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2023
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 26
Plant Area (Sq.Ft.) 466,092
Annual Production 1,092,000 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,179 1,511,749 kWh $0.05
Electricity Demand $34,206 2,980 kW-months/year $11.48
Electricity Fees $19,374 - $ -
Natural Gas $67,402 8,896 MMBtu $7.58
TOTAL ENERGY COSTS $189,161
RECOMMENDED SAVINGS* $14,317 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,304
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,127
Cost:
$11,275
$5,279 117,307 $1,848 161 - - $5,279
117,307
kWh
$1,848
161
kW-months/year
-
-
MMBtu
02: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$3,068
Cost:
$525
- - - - $3,068 405 -
-
kWh
-
-
kW-months/year
$3,068
405
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,889
Cost:
$5,872
$232 5,165 $1,656 144 - - $232
5,165
kWh
$1,656
144
kW-months/year
-
-
MMBtu
04: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$1,598
Cost:
$456
- - - - $1,598 211 -
-
kWh
-
-
kW-months/year
$1,598
211
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$400
Cost:
$843
$127 2,817 $273 24 - - $127
2,817
kWh
$273
24
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$236
Cost:
$1,000
$186 4,129 $50 4 - - $186
4,129
kWh
$50
4
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$14,317
Cost:
$19,971
$5,824 129,418 $3,828 333 $4,666 616 $5,824
129,418
kWh
$3,828
333
kW-months/year
$4,666
616
MMBtu
TOTAL IMPLEMENTED Savings:
$3,304
Cost:
$1,525
$186 4,129 $50 4 $3,068 405 $186
4,129
kWh
$50
4
kW-months/year
$3,068
405
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas