IAC Assessment: WM0198
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0198
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2023
Principal Product Transportation Refrigeration Units, and R&D
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 535,000
Annual Production 600,000 Units
Production Hrs. Annual 4,420
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $389,753 6,335,048 kWh $0.06
Electricity Demand $192,225 16,762 kW-months/year $11.47
Electricity Fees $138,392 - $ -
Natural Gas $287,218 34,429 MMBtu $8.34
TOTAL ENERGY COSTS $1,021,563
RECOMMENDED SAVINGS* $45,044 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,115
Cost:
$49,375
- - $19,115 1,667 - - - - - - -
-
kWh
$19,115
1,667
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$9,760
Cost:
$1,950
- - - - - - - - $9,760 1,952 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,760
1,952
Tgal
03: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$8,477
Cost:
$12,900
- - - - $8,477 - - - - - -
-
kWh
-
-
kW-months/year
$8,477
-
$
-
-
MMBtu
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,991
Cost:
$4,800
$1,436 23,167 $555 48 - - - - - - $1,436
23,167
kWh
$555
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,770
Cost:
-
- - - - - - $1,770 212 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,770
212
MMBtu
-
-
Tgal
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,580
Cost:
-
$1,139 18,374 $440 38 - - - - - - $1,139
18,374
kWh
$440
38
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$808
Cost:
$680
- - - - - - $808 97 - - -
-
kWh
-
-
kW-months/year
-
-
$
$808
97
MMBtu
-
-
Tgal
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$799
Cost:
$2,886
$576 9,294 $222 19 - - - - - - $576
9,294
kWh
$222
19
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$744
Cost:
$320
$537 8,656 $208 18 - - - - - - $537
8,656
kWh
$208
18
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$45,044
Cost:
$72,911
$3,688 59,491 $20,540 1,791 $8,477 - $2,578 309 $9,760 1,952 $3,688
59,491
kWh
$20,540
1,791
kW-months/year
$8,477
-
$
$2,578
309
MMBtu
$9,760
1,952
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal