IAC logo
IAC Assessment: WM0200
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0200
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2023
Principal Product Plastics sheets
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 95,000
Annual Production 33,000,000 Pounds
Production Hrs. Annual 4,800
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,847 6,469,383 kWh $0.04
Electricity Demand $148,704 18,588 kW-months/year $8.00
Electricity Fees $33,588 - $ -
Natural Gas $167,837 25,240 MMBtu $6.65
TOTAL ENERGY COSTS $625,730
RECOMMENDED SAVINGS* $20,431 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,352
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$8,579
Cost:
$10,000
- - - - $8,579 1,290 - - -
-
kWh
-
-
kW-months/year
$8,579
1,290
MMBtu
-
-
Tgal
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,500
Cost:
$12,375
- - - - $4,500 677 - - -
-
kWh
-
-
kW-months/year
$4,500
677
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,827
Cost:
$3,344
$1,915 45,590 $912 114 - - - - $1,915
45,590
kWh
$912
114
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,847
Cost:
$800
$1,452 34,567 $395 49 - - - - $1,452
34,567
kWh
$395
49
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,426
Cost:
$750
- - - - - - $1,426 387 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,426
387
Tgal
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,252
Cost:
$1,288
$848 20,201 $404 51 - - - - $848
20,201
kWh
$404
51
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$20,431
Cost:
$28,557
$4,215 100,358 $1,711 214 $13,079 1,967 $1,426 387 $4,215
100,358
kWh
$1,711
214
kW-months/year
$13,079
1,967
MMBtu
$1,426
387
Tgal
TOTAL IMPLEMENTED Savings:
$7,352
Cost:
$6,182
$4,215 100,358 $1,711 214 - - $1,426 387 $4,215
100,358
kWh
$1,711
214
kW-months/year
-
-
MMBtu
$1,426
387
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage