IAC logo
IAC Assessment: WM0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2023
Principal Product Ready Mixed Concrete
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 110,000
Annual Production 130,000 Tons
Production Hrs. Annual 4,200
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,261 769,874 kWh $0.07
Electricity Demand $27,933 3,844 kW-months/year $7.27
Electricity Fees $19,000 - $ -
Natural Gas $62,725 24,705 MMBtu $2.54
TOTAL ENERGY COSTS $209,666
RECOMMENDED SAVINGS* $25,634 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,108
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$22,875
Cost:
$1,950
- - - - $22,875 4,155 -
-
kWh
-
-
kW-months/year
$22,875
4,155
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,440
Cost:
$2,330
$1,261 18,012 $179 25 - - $1,261
18,012
kWh
$179
25
kW-months/year
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$651
Cost:
$1,001
$502 7,174 $149 21 - - $502
7,174
kWh
$149
21
kW-months/year
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$571
Cost:
$750
$440 6,290 $131 18 - - $440
6,290
kWh
$131
18
kW-months/year
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$97
Cost:
$240
$87 1,245 $9 1 - - $87
1,245
kWh
$9
1
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$25,634
Cost:
$6,271
$2,290 32,721 $469 64 $22,875 4,155 $2,290
32,721
kWh
$469
64
kW-months/year
$22,875
4,155
Tgal
TOTAL IMPLEMENTED Savings:
$2,108
Cost:
$3,320
$1,788 25,547 $320 44 - - $1,788
25,547
kWh
$320
44
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal