IAC logo
IAC Assessment: WM0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2024
Principal Product Contracted Metal Fabrication
NAICS 331524 - Aluminum Foundries (except Die-Casting)
SIC 3325 - Steel Foundries, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 83,875
Annual Production 120,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $456,802 7,580,375 kWh $0.06
Electricity Demand $258,292 16,732 kW-months/year $15.44
Electricity Fees $131,938 - $ -
Natural Gas $343,011 43,442 MMBtu $7.90
TOTAL ENERGY COSTS $1,190,043
RECOMMENDED SAVINGS* $43,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage
$ kWh $ kW-months/year $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,028
Cost:
$12,825
$14,966 249,438 $4,061 263 - - $14,966
249,438
kWh
$4,061
263
kW-months/year
-
-
Tgal
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$16,759
Cost:
$2,500
- - - - $16,759 2,631 -
-
kWh
-
-
kW-months/year
$16,759
2,631
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,619
Cost:
$4,084
$2,676 44,598 $943 61 - - $2,676
44,598
kWh
$943
61
kW-months/year
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,129
Cost:
$540
$1,429 23,823 $1,700 110 - - $1,429
23,823
kWh
$1,700
110
kW-months/year
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,225
Cost:
$1,100
$906 15,096 $320 21 - - $906
15,096
kWh
$320
21
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$43,760
Cost:
$21,049
$19,977 332,955 $7,024 455 $16,759 2,631 $19,977
332,955
kWh
$7,024
455
kW-months/year
$16,759
2,631
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage