IAC logo
IAC Assessment: WM0208
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0208
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2024
Principal Product snow removal truck attachments
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $500,000-$1,000,000
# of Employees 300
Plant Area (Sq.Ft.) 177,000
Annual Production 55,000 Units
Production Hrs. Annual 8,400
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $389,789 5,866,104 kWh $0.07
Electricity Demand $262,479 16,416 kW-months/year $15.99
Electricity Fees $95,714 - $ -
Natural Gas $279,561 63,100 MMBtu $4.43
TOTAL ENERGY COSTS $1,027,543
RECOMMENDED SAVINGS* $62,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$37,878
Cost:
$122,100
$28,141 426,376 $9,737 609 - - $28,141
426,376
kWh
$9,737
609
kW-months/year
-
-
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$9,702
Cost:
$8,700
- - - - $9,702 2,190 -
-
kWh
-
-
kW-months/year
$9,702
2,190
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,761
Cost:
$1,950
$4,280 64,484 $1,481 93 - - $4,280
64,484
kWh
$1,481
93
kW-months/year
-
-
MMBtu
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,796
Cost:
-
$2,214 33,551 - - $1,582 357 $2,214
33,551
kWh
-
-
kW-months/year
$1,582
357
MMBtu
05: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$3,395
Cost:
$4,786
$2,522 38,213 $873 55 - - $2,522
38,213
kWh
$873
55
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,014
Cost:
$4,664
$1,633 24,743 $381 24 - - $1,633
24,743
kWh
$381
24
kW-months/year
-
-
MMBtu
07: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$430
Cost:
$700
- - - - $430 97 -
-
kWh
-
-
kW-months/year
$430
97
MMBtu
TOTAL RECOMMENDED Savings:
$62,975
Cost:
$142,900
$38,790 587,367 $12,471 780 $11,714 2,644 $38,790
587,367
kWh
$12,471
780
kW-months/year
$11,714
2,644
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas