IAC Assessment: WM0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2024
Principal Product Electrical Terminal Blocks and Connectors
NAICS 334417 - Electronic Connector Manufacturing
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $100,000,000-$500,000,000
# of Employees 150
Plant Area (Sq.Ft.) 114,000
Annual Production 2,400,000 Units
Production Hrs. Annual 2,160
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,864 899,314 kWh $0.06
Electricity Demand $33,930 2,235 kW-months/year $15.18
Electricity Fees $20,992 - $ -
Natural Gas $55,685 6,187 MMBtu $9.00
TOTAL ENERGY COSTS $164,471
RECOMMENDED SAVINGS* $18,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,096
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$7,114
Cost:
$700
- - $7,114 469 - - -
-
kWh
$7,114
469
kW-months/year
-
-
MMBtu
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$5,517
Cost:
$16,193
- - - - $5,517 613 -
-
kWh
-
-
kW-months/year
$5,517
613
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,617
Cost:
$9,500
- - - - $4,617 513 -
-
kWh
-
-
kW-months/year
$4,617
513
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,148
Cost:
$150
$852 14,204 $296 20 - - $852
14,204
kWh
$296
20
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$216
Cost:
$345
$160 2,665 $56 4 - - $160
2,665
kWh
$56
4
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$110
Cost:
-
$87 1,449 $23 2 - - $87
1,449
kWh
$23
2
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,723
Cost:
$26,888
$1,099 18,318 $7,490 493 $10,134 1,126 $1,099
18,318
kWh
$7,490
493
kW-months/year
$10,134
1,126
MMBtu
TOTAL IMPLEMENTED Savings:
$13,096
Cost:
$10,695
$1,012 16,869 $7,466 492 $4,617 513 $1,012
16,869
kWh
$7,466
492
kW-months/year
$4,617
513
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas