IAC logo
IAC Assessment: WV0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1994
Principal Product Truck hoods
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 303
Plant Area (Sq.Ft.) 284,000
Annual Production 0 Units
Production Hrs. Annual 8,064
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $794,357 16,883,060 kWh $0.05
Natural Gas $349,177 92,484 MMBtu $3.78
TOTAL ENERGY COSTS $1,143,534
RECOMMENDED SAVINGS* $285,031 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $195,686
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,256
Cost:
$5,485
$2,256 85,287 - - $2,256
85,287
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$298
Cost:
-
$298 10,551 - - $298
10,551
kWh
-
-
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$77,346
Cost:
$5,000
- - $77,346 20,462 -
-
kWh
$77,346
20,462
MMBtu
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$15,913
Cost:
$8,987
$15,913 602,579 - - $15,913
602,579
kWh
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$22,600
Cost:
$9,000
- - $22,600 5,979 -
-
kWh
$22,600
5,979
MMBtu
06: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$47,244
Cost:
$1,200
- - $47,244 12,498 -
-
kWh
$47,244
12,498
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,475
Cost:
$480
- - $2,475 655 -
-
kWh
$2,475
655
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,225
Cost:
$569
- - $2,225 589 -
-
kWh
$2,225
589
MMBtu
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$95,384
Cost:
$6,300
$95,384 4,248,535 - - $95,384
4,248,535
kWh
-
-
MMBtu
10: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$15,702
Cost:
$800
- - $15,702 4,154 -
-
kWh
$15,702
4,154
MMBtu
11: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,588
Cost:
-
$3,588 135,991 - - $3,588
135,991
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$285,031
Cost:
$37,821
$117,439 5,082,943 $167,592 44,337 $117,439
5,082,943
kWh
$167,592
44,337
MMBtu
TOTAL IMPLEMENTED Savings:
$195,686
Cost:
$18,634
$97,938 4,344,373 $97,748 25,860 $97,938
4,344,373
kWh
$97,748
25,860
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas