IAC logo
IAC Assessment: WV0063
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0063
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1995
Principal Product Glass and Vinyl windows
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 310
Plant Area (Sq.Ft.) 93,000
Annual Production 600,000 Pieces
Production Hrs. Annual 4,080
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,896 2,462,778 kWh $0.06
Natural Gas $20,197 2,346 MMBtu $8.61
TOTAL ENERGY COSTS $162,093
RECOMMENDED SAVINGS* $8,698 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,612
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,509
Cost:
$2,400
$3,509 82,063 - - $3,509
82,063
kWh
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$778
Cost:
$360
- - $778 101 -
-
kWh
$778
101
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,308
Cost:
$15
$3,308 77,374 - - $3,308
77,374
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,103
Cost:
-
$1,103 25,791 - - $1,103
25,791
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,698
Cost:
$2,775
$7,920 185,228 $778 101 $7,920
185,228
kWh
$778
101
MMBtu
TOTAL IMPLEMENTED Savings:
$4,612
Cost:
$2,400
$4,612 107,854 - - $4,612
107,854
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas