Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1996 |
Principal Product | Insulation Products |
NAICS | n/a |
SIC | 3295 - Minerals, Ground Or Treated |
Sales | $10,000,000-$50,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 170,000 |
Annual Production | 25,000,000 Pounds |
Production Hrs. Annual | 4,896 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $105,859 | 2,523,740 | kWh | $0.04 |
Electricity Demand | $25,357 | 6,517 | kW-months/year | $3.89 |
Electricity Fees | $9,010 | - | $ | - |
Natural Gas | $224,810 | 50,991 | MMBtu | $4.41 |
TOTAL ENERGY COSTS | $365,036 | |||
RECOMMENDED SAVINGS* | $46,918 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,376 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $450 Cost: $640 |
$450 | 12,603 | - | - | - | - | - | - |
$450 12,603 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,654 Cost: $42 |
$2,654 | 74,443 | - | - | - | - | - | - |
$2,654 74,443 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $14,094 Cost: $8,910 |
- | - | $14,094 | 3,196 | - | - | - | - |
- - kWh |
$14,094 3,196 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,561 Cost: $968 |
$(-86) | (-2,345) | $3,647 | 827 | - | - | - | - |
$(-86) (-2,345) kWh |
$3,647 827 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $1,367 Cost: $4,500 |
- | - | $1,367 | 310 | - | - | - | - |
- - kWh |
$1,367 310 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD |
Savings: $11,520 Cost: $5,784 |
- | - | - | - | $11,520 | - | - | - |
- - kWh |
- - MMBtu |
$11,520 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $13,272 Cost: $7,000 |
- | - | - | - | - | - | $13,272 | - |
- - kWh |
- - MMBtu |
- - lb |
$13,272 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $46,918 Cost: $27,844 |
$3,018 | 84,701 | $19,108 | 4,333 | $11,520 | - | $13,272 | - | $3,018 84,701 kWh |
$19,108 4,333 MMBtu |
$11,520 - lb |
$13,272 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,376 Cost: $7,682 |
$3,104 | 87,046 | - | - | - | - | $13,272 | - | $3,104 87,046 kWh |
- - MMBtu |
- - lb |
$13,272 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes |