Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1997 |
Principal Product | Dimensional Lumber |
NAICS | n/a |
SIC | 2426 - Hardwood Dimension & Flooring Mills |
Sales | $5,000,000-$10,000,000 |
# of Employees | 56 |
Plant Area (Sq.Ft.) | 19,000 |
Annual Production | 12,000,000 Pounds |
Production Hrs. Annual | 4,896 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $175,535 | 2,601,407 | kWh | $0.07 |
Electricity Fees | $378 | - | $ | - |
Natural Gas | $12,986 | 1,698 | MMBtu | $7.65 |
TOTAL ENERGY COSTS | $188,899 | |||
RECOMMENDED SAVINGS* | $368,622 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | By-product Production | Electricity Usage | Natural Gas | Administrative Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,723 Cost: $17,067 |
$2,723 | 63,306 | - | - | - | - | - | - |
$2,723 63,306 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $6,750 Cost: $485 |
$6,750 | 157,093 | - | - | - | - | - | - |
$6,750 157,093 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $2,378 Cost: - |
$2,378 | 55,100 | - | - | - | - | - | - |
$2,378 55,100 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,850 Cost: $35,000 |
$7,850 | 182,591 | - | - | - | - | - | - |
$7,850 182,591 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $958 Cost: $12 |
$958 | 22,274 | - | - | - | - | - | - |
$958 22,274 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,621 Cost: $485 |
- | - | $1,621 | 212 | - | - | - | - |
- - kWh |
$1,621 212 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,218 Cost: $1,680 |
- | - | $2,218 | 290 | - | - | - | - |
- - kWh |
$2,218 290 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $33,194 Cost: $100 |
- | - | - | - | - | - | $33,194 | - |
- - kWh |
- - MMBtu |
- - $ |
$33,194 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $39,600 Cost: - |
- | - | - | - | - | - | $39,600 | - |
- - kWh |
- - MMBtu |
- - $ |
$39,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME |
Savings: $271,330 Cost: $4,000 |
$(-15,764) | (-366,647) | - | - | $287,094 | - | - | - |
$(-15,764) (-366,647) kWh |
- - MMBtu |
$287,094 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $368,622 Cost: $58,829 |
$4,895 | 113,717 | $3,839 | 502 | $287,094 | - | $72,794 | - | $4,895 113,717 kWh |
$3,839 502 MMBtu |
$287,094 - $ |
$72,794 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||