Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1997 |
Principal Product | Aluminum Oxides and Hydrates |
NAICS | n/a |
SIC | 3341 - Secondary Nonferrous Metals |
Sales | $10,000,000-$50,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 120,000,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $267,957 | 4,086,167 | kWh | $0.07 |
TOTAL ENERGY COSTS | $267,957 | |||
RECOMMENDED SAVINGS* | $601,093 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $96,820 |
#|Description |
Savings Cost |
Status | Electricity Usage | Administrative Changes | Primary Raw Material | Primary Product | Electricity Usage | Administrative Changes | Primary Raw Material | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $87,836 Cost: $3,232 |
$87,836 | 1,339,390 | - | - | - | - | - | - |
$87,836 1,339,390 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $8,803 Cost: $1,000 |
$8,803 | 134,232 | - | - | - | - | - | - |
$8,803 134,232 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $273 Cost: $212 |
$273 | 4,103 | - | - | - | - | - | - |
$273 4,103 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $125 Cost: - |
- | - | $125 | - | - | - | - | - |
- - kWh |
$125 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $380,000 Cost: $90,000 |
- | - | - | - | - | - | $380,000 | - |
- - kWh |
- - $ |
- - $ |
$380,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $56 Cost: - |
- | - | $56 | - | - | - | - | - |
- - kWh |
$56 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $20,000 Cost: $90,000 |
- | - | - | - | - | - | $20,000 | - |
- - kWh |
- - $ |
- - $ |
$20,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.423 MOVE PRODUCT USING MECHANICAL MEANS |
Savings: $104,000 Cost: $3,000 |
- | - | - | - | $104,000 | - | - | - |
- - kWh |
- - $ |
$104,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $601,093 Cost: $187,444 |
$96,912 | 1,477,725 | $181 | - | $104,000 | - | $400,000 | - | $96,912 1,477,725 kWh |
$181 - $ |
$104,000 - $ |
$400,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $96,820 Cost: $4,232 |
$96,639 | 1,473,622 | $181 | - | - | - | - | - | $96,639 1,473,622 kWh |
$181 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||