IAC logo
IAC Assessment: WV0129
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1997
Principal Product Plastic Compounding Materials
NAICS n/a
SIC 3087 - Custom Compound Purchased Resins
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 89,400
Annual Production 30,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $558,308 7,817,116 kWh $0.07
Electricity Fees $72,772 - $ -
Natural Gas $47,631 20,356 MMBtu $2.34
TOTAL ENERGY COSTS $697,611
RECOMMENDED SAVINGS* $496,263 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,471
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Administrative Changes Increase in Production Electricity Usage Natural Gas Water Disposal Administrative Changes Increase in Production
$ kWh $ MMBtu $ Tgal $ $ $ %
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,294
Cost:
$12,594
$4,294 53,048 - - - - - - - - $4,294
53,048
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,704
Cost:
$205
$1,704 21,102 - - - - - - - - $1,704
21,102
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,750
Cost:
$375
$1,750 21,688 - - - - - - - - $1,750
21,688
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
%
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$550
Cost:
$500
- - $550 235 - - - - - - -
-
kWh
$550
235
MMBtu
-
-
Tgal
-
-
$
-
-
%
05: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,848
Cost:
$250
- - $1,848 790 - - - - - - -
-
kWh
$1,848
790
MMBtu
-
-
Tgal
-
-
$
-
-
%
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$240
Cost:
$1,475
- - $240 103 - - - - - - -
-
kWh
$240
103
MMBtu
-
-
Tgal
-
-
$
-
-
%
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$53
Cost:
$44
- - $53 22 - - - - - - -
-
kWh
$53
22
MMBtu
-
-
Tgal
-
-
$
-
-
%
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$60,000
Cost:
$200
- - - - - - $60,000 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$60,000
-
$
-
-
%
09: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$5,824
Cost:
$2,300
- - - - $5,824 1,386,667 - - - - -
-
kWh
-
-
MMBtu
$5,824
1,386,667
Tgal
-
-
$
-
-
%
10: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$420,000
Cost:
$35,000
- - - - - - - - $420,000 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
$420,000
-
%
TOTAL RECOMMENDED Savings:
$496,263
Cost:
$52,943
$7,748 95,838 $2,691 1,150 $5,824 1,386,667 $60,000 - $420,000 - $7,748
95,838
kWh
$2,691
1,150
MMBtu
$5,824
1,386,667
Tgal
$60,000
-
$
$420,000
-
%
TOTAL IMPLEMENTED Savings:
$12,471
Cost:
$15,813
$6,044 74,736 $603 257 $5,824 1,386,667 - - - - $6,044
74,736
kWh
$603
257
MMBtu
$5,824
1,386,667
Tgal
-
-
$
-
-
%
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ %