Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1998 |
Principal Product | Dry Dog Food |
NAICS | n/a |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 14,000 |
Annual Production | 41,000 Tons |
Production Hrs. Annual | 7,488 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $147,252 | 2,928,253 | kWh | $0.05 |
Natural Gas | $188,557 | 26,592 | MMBtu | $7.09 |
TOTAL ENERGY COSTS | $335,809 | |||
RECOMMENDED SAVINGS* | $70,526 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,032 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Water Consumption | Electricity Usage | Natural Gas | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $554 Cost: $440 |
$554 | 14,361 | - | - | - | - | - | - |
$554 14,361 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,014 Cost: $11,290 |
$5,014 | 127,491 | - | - | - | - | - | - |
$5,014 127,491 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $500 Cost: $290 |
- | - | $500 | 71 | - | - | - | - |
- - kWh |
$500 71 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $527 Cost: $2,700 |
$527 | 13,775 | - | - | - | - | - | - |
$527 13,775 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $5,117 Cost: $1,875 |
- | - | $5,117 | 721 | - | - | - | - |
- - kWh |
$5,117 721 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,532 Cost: $1,120 |
- | - | $1,532 | 216 | - | - | - | - |
- - kWh |
$1,532 216 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $568 Cost: $840 |
- | - | $568 | 157 | - | - | - | - |
- - kWh |
$568 157 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $1,307 Cost: $1,300 |
- | - | - | - | - | - | $1,307 | - |
- - kWh |
- - MMBtu |
- - $ |
$1,307 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $3,975 Cost: $11,000 |
- | - | - | - | $3,975 | - | - | - |
- - kWh |
- - MMBtu |
$3,975 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,512 Cost: - |
- | - | - | - | $1,512 | - | - | - |
- - kWh |
- - MMBtu |
$1,512 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $49,920 Cost: $15,000 |
- | - | - | - | $49,920 | - | - | - |
- - kWh |
- - MMBtu |
$49,920 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $70,526 Cost: $45,855 |
$6,095 | 155,627 | $7,717 | 1,165 | $55,407 | - | $1,307 | - | $6,095 155,627 kWh |
$7,717 1,165 MMBtu |
$55,407 - $ |
$1,307 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,032 Cost: $28,140 |
$5,568 | 141,852 | $2,032 | 287 | $51,432 | - | - | - | $5,568 141,852 kWh |
$2,032 287 MMBtu |
$51,432 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Water Consumption | Electricity Usage | Natural Gas | Administrative Changes | Water Consumption |