IAC logo
IAC Assessment: WV0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1998
Principal Product Plastic Beverage Bottles
NAICS n/a
SIC 3085 - Plastics Bottles
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 700,000
Annual Production 1,080,000,000 Pieces
Production Hrs. Annual 8,664
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,742,445 72,071,220 kWh $0.04
Natural Gas $217,889 33,555 MMBtu $6.49
TOTAL ENERGY COSTS $2,960,334
RECOMMENDED SAVINGS* $126,535 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,467
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ MMBtu $ lb $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,443
Cost:
$9,661
$4,443 175,850 - - - - - - $4,443
175,850
kWh
-
-
MMBtu
-
-
lb
-
-
lb
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$804
Cost:
$576
- - $804 108 - - - - -
-
kWh
$804
108
MMBtu
-
-
lb
-
-
lb
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,320
Cost:
$1,032
$8,320 329,719 - - - - - - $8,320
329,719
kWh
-
-
MMBtu
-
-
lb
-
-
lb
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,429
Cost:
-
$2,429 96,131 - - - - - - $2,429
96,131
kWh
-
-
MMBtu
-
-
lb
-
-
lb
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$364
Cost:
-
$364 14,361 - - - - - - $364
14,361
kWh
-
-
MMBtu
-
-
lb
-
-
lb
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$66,775
Cost:
-
- - $66,775 - - - - - -
-
kWh
$66,775
-
MMBtu
-
-
lb
-
-
lb
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$398
Cost:
$448
$398 15,826 - - - - - - $398
15,826
kWh
-
-
MMBtu
-
-
lb
-
-
lb
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,400
Cost:
$100
- - - - $5,400 - - - -
-
kWh
-
-
MMBtu
$5,400
-
lb
-
-
lb
09: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$102
Cost:
-
- - - - - - $102 - -
-
kWh
-
-
MMBtu
-
-
lb
$102
-
lb
10: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$37,500
Cost:
$50,000
- - - - $37,500 - - - -
-
kWh
-
-
MMBtu
$37,500
-
lb
-
-
lb
TOTAL RECOMMENDED Savings:
$126,535
Cost:
$61,817
$15,954 631,887 $67,579 108 $42,900 - $102 - $15,954
631,887
kWh
$67,579
108
MMBtu
$42,900
-
lb
$102
-
lb
TOTAL IMPLEMENTED Savings:
$56,467
Cost:
$61,369
$12,763 505,569 $804 108 $42,900 - - - $12,763
505,569
kWh
$804
108
MMBtu
$42,900
-
lb
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz)