IAC Assessment: WV0141
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0141
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1998
Principal Product Hand-pressed Glassware
NAICS n/a
SIC 3229 - Pressed And Blown Glass, Nec
Sales $10,000,000-$50,000,000
# of Employees 144
Plant Area (Sq.Ft.) 184,000
Annual Production 0 Tons
Production Hrs. Annual 2,125
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,145 2,219,812 kWh $0.06
Electricity Demand $34,996 6,273 kW-months/year $5.58
Natural Gas $435,432 106,855 MMBtu $4.07
TOTAL ENERGY COSTS $594,573
RECOMMENDED SAVINGS* $56,237 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,478
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$674
Cost:
$336
$674 16,706 - - - - - - - - - - $674
16,706
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$92
Cost:
$85
- - - - $92 23 - - - - - - -
-
kWh
-
-
kW-months/year
$92
23
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,488
Cost:
$910
- - - - $5,488 1,379 - - - - - - -
-
kWh
-
-
kW-months/year
$5,488
1,379
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$198
Cost:
$152
$43 1,172 $155 27 - - - - - - - - $43
1,172
kWh
$155
27
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$3,479
Cost:
$677
- - - - $3,479 875 - - - - - - -
-
kWh
-
-
kW-months/year
$3,479
875
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$2,538
Cost:
$470
- - - - $2,538 638 - - - - - - -
-
kWh
-
-
kW-months/year
$2,538
638
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$166
Cost:
$40
$166 4,103 - - - - - - - - - - $166
4,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
08: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$650
Cost:
$300
- - - - - - $650 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$650
-
Tgal
-
-
lb
-
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,752
Cost:
$90
- - - - - - - - $1,752 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,752
-
lb
-
-
$
10: 4.452 ELIMINATE SHIFT Savings:
$8,050
Cost:
$75
- - - - - - - - - - $8,050 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$8,050
-
$
11: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$33,150
Cost:
$750
- - - - - - - - - - $33,150 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$33,150
-
$
TOTAL RECOMMENDED Savings:
$56,237
Cost:
$3,885
$883 21,981 $155 27 $11,597 2,915 $650 - $1,752 - $41,200 - $883
21,981
kWh
$155
27
kW-months/year
$11,597
2,915
MMBtu
$650
-
Tgal
$1,752
-
lb
$41,200
-
$
TOTAL IMPLEMENTED Savings:
$49,478
Cost:
$2,353
$883 21,981 $155 27 $5,488 1,379 - - $1,752 - $41,200 - $883
21,981
kWh
$155
27
kW-months/year
$5,488
1,379
MMBtu
-
-
Tgal
$1,752
-
lb
$41,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes