Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1998
Principal Product Hand made lamp parts
NAICS n/a
SIC 3229 - Pressed And Blown Glass, Nec
Sales $1,000,000-$5,000,000
# of Employees 70
Plant Area (Sq.Ft.) 100,000
Annual Production 1,500 Tons
Production Hrs. Annual 2,125
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,938 604,924 kWh $0.06
Natural Gas $209,732 141,028 MMBtu $1.49
TOTAL ENERGY COSTS $246,670
RECOMMENDED SAVINGS* $38,887 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,272
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$1,491
Cost:
$1,400
- - $1,491 1,001 - - - - -
-
kWh
$1,491
1,001
MMBtu
-
-
lb
-
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$387
Cost:
$1,056
- - $387 260 - - - - -
-
kWh
$387
260
MMBtu
-
-
lb
-
-
$
03: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$152
Cost:
$316
- - $152 102 - - - - -
-
kWh
$152
102
MMBtu
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$14
Cost:
$10
$14 293 - - - - - - $14
293
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,509
Cost:
$605
- - $1,509 1,013 - - - - -
-
kWh
$1,509
1,013
MMBtu
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$51
Cost:
$88
$51 879 - - - - - - $51
879
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,358
Cost:
$1,330
- - $3,358 2,254 - - - - -
-
kWh
$3,358
2,254
MMBtu
-
-
lb
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$139
Cost:
$126
$139 2,345 - - - - - - $139
2,345
kWh
-
-
MMBtu
-
-
lb
-
-
$
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,076
Cost:
$11,000
- - - - $1,076 - - - -
-
kWh
-
-
MMBtu
$1,076
-
lb
-
-
$
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$960
Cost:
$100
- - - - $960 24 - - -
-
kWh
-
-
MMBtu
$960
24
lb
-
-
$
11: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$29,750
Cost:
$500
- - - - - - $29,750 - -
-
kWh
-
-
MMBtu
-
-
lb
$29,750
-
$
TOTAL RECOMMENDED Savings:
$38,887
Cost:
$16,531
$204 3,517 $6,897 4,630 $2,036 24 $29,750 - $204
3,517
kWh
$6,897
4,630
MMBtu
$2,036
24
lb
$29,750
-
$
TOTAL IMPLEMENTED Savings:
$34,272
Cost:
$2,154
$204 3,517 $3,358 2,254 $960 24 $29,750 - $204
3,517
kWh
$3,358
2,254
MMBtu
$960
24
lb
$29,750
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $