IAC logo
IAC Assessment: WV0144
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0144
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1998
Principal Product Machine made crystal
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 282
Plant Area (Sq.Ft.) 140,000
Annual Production 9,000 Tons
Production Hrs. Annual 8,640
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $417,841 8,980,950 kWh $0.05
Electricity Demand $196,514 22,000 kW-months/year $8.93
Electricity Fees $(-15,763) - $ -
Natural Gas $407,695 106,340 MMBtu $3.83
TOTAL ENERGY COSTS $1,006,287
RECOMMENDED SAVINGS* $185,662 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $111,554
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ lb $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$588
Cost:
-
$588 23,740 - - - - - - - - - - - - $588
23,740
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,584
Cost:
$1,007
- - - - $8,584 2,241 - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,584
2,241
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,478
Cost:
$140
$2,478 100,528 - - - - - - - - - - - - $2,478
100,528
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,816
Cost:
$560
$1,816 73,564 - - - - - - - - - - - - $1,816
73,564
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,809
Cost:
$263
- - - - $5,809 1,517 - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,809
1,517
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,804
Cost:
$2,000
- - - - $3,804 1,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,804
1,000
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,565
Cost:
$3,310
$3,085 125,147 $4,480 547 - - - - - - - - - - $3,085
125,147
kWh
$4,480
547
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,801
Cost:
$390
$2,801 113,716 - - - - - - - - - - - - $2,801
113,716
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
09: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$35,092
Cost:
-
- - - - - - - - - - - - $35,092 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
$35,092
-
$
10: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$122
Cost:
-
- - - - - - - - - - $122 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$122
-
lb
-
-
$
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,403
Cost:
$11,000
- - - - - - - - $3,403 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$3,403
-
lb
-
-
lb
-
-
$
12: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$23,400
Cost:
$8,050
- - - - - - $23,400 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$23,400
-
gal
-
-
lb
-
-
lb
-
-
$
13: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$6,700
Cost:
$60
- - - - - - - - $6,700 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$6,700
-
lb
-
-
lb
-
-
$
14: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$300
Cost:
$60
- - - - - - - - $300 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$300
-
lb
-
-
lb
-
-
$
15: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$83,200
Cost:
$1,673
- - - - - - - - - - - - $83,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
$83,200
-
$
TOTAL RECOMMENDED Savings:
$185,662
Cost:
$28,513
$10,768 436,695 $4,480 547 $18,197 4,758 $23,400 - $10,403 - $122 - $118,292 - $10,768
436,695
kWh
$4,480
547
kW-months/year
$18,197
4,758
MMBtu
$23,400
-
gal
$10,403
-
lb
$122
-
lb
$118,292
-
$
TOTAL IMPLEMENTED Savings:
$111,554
Cost:
$7,060
$8,290 336,167 $4,480 547 $8,584 2,241 - - $7,000 - - - $83,200 - $8,290
336,167
kWh
$4,480
547
kW-months/year
$8,584
2,241
MMBtu
-
-
gal
$7,000
-
lb
-
-
lb
$83,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes