IAC Assessment: WV0162
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0162
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1999
Principal Product Complex Grey/Ductile Iron Castings
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 25,800
Annual Production 5,200 Pounds
Production Hrs. Annual 4,160
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,558 2,898,007 kWh $0.06
Electricity Fees $378 - $ -
Natural Gas $17,581 3,623 MMBtu $4.85
TOTAL ENERGY COSTS $192,517
RECOMMENDED SAVINGS* $148,082 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,386
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ $ $ MMBtu $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$107,972
Cost:
$39,000
- - $107,972 - - - - - - - -
-
kWh
$107,972
-
$
-
-
MMBtu
-
-
lb
-
-
$
02: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$6,113
Cost:
$4,000
- - - - - - - - $6,113 - -
-
kWh
-
-
$
-
-
MMBtu
-
-
lb
$6,113
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$317
Cost:
$20
$317 5,275 - - - - - - - - $317
5,275
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$2,895
Cost:
-
- - $2,895 - - - - - - - -
-
kWh
$2,895
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$1,295
Cost:
$1,350
- - - - $1,295 771 - - - - -
-
kWh
-
-
$
$1,295
771
MMBtu
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,920
Cost:
$109
$3,920 65,064 - - - - - - - - $3,920
65,064
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,780
Cost:
$36
$1,780 29,308 - - - - - - - - $1,780
29,308
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$988
Cost:
$636
$988 16,413 - - - - - - - - $988
16,413
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$381
Cost:
$150
$381 6,448 - - - - - - - - $381
6,448
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$691
Cost:
$180
$691 41,618 - - - - - - - - $691
41,618
kWh
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$560
Cost:
$2,000
- - - - - - $560 - - - -
-
kWh
-
-
$
-
-
MMBtu
$560
-
lb
-
-
$
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,170
Cost:
$50
- - - - - - $1,170 - - - -
-
kWh
-
-
$
-
-
MMBtu
$1,170
-
lb
-
-
$
13: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$20,000
Cost:
$432
- - - - - - - - $20,000 - -
-
kWh
-
-
$
-
-
MMBtu
-
-
lb
$20,000
-
$
TOTAL RECOMMENDED Savings:
$148,082
Cost:
$47,963
$8,077 164,126 $110,867 - $1,295 771 $1,730 - $26,113 - $8,077
164,126
kWh
$110,867
-
$
$1,295
771
MMBtu
$1,730
-
lb
$26,113
-
$
TOTAL IMPLEMENTED Savings:
$27,386
Cost:
$1,383
$7,386 122,508 - - - - - - $20,000 - $7,386
122,508
kWh
-
-
$
-
-
MMBtu
-
-
lb
$20,000
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes