Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1999 |
Principal Product | Fiber filters |
NAICS | n/a |
SIC | 3564 - Blowers And Fans |
Sales | $10,000,000-$50,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 357,000 Thousand Feet |
Production Hrs. Annual | 8,568 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $156,806 | 3,606,389 | kWh | $0.04 |
Natural Gas | $267,372 | 75,878 | MMBtu | $3.52 |
TOTAL ENERGY COSTS | $424,178 | |||
RECOMMENDED SAVINGS* | $91,943 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $81,625 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | LPG | Water Disposal | Solid Waste (non-haz) | Primary Product | Electricity Usage | Natural Gas | LPG | Water Disposal | Solid Waste (non-haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,038 Cost: $30 |
$2,038 | 71,805 | - | - | - | - | - | - | - | - | - | - |
$2,038 71,805 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,261 Cost: $132 |
$1,261 | 44,549 | - | - | - | - | - | - | - | - | - | - |
$1,261 44,549 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,997 Cost: $1,290 |
$1,997 | 70,340 | - | - | - | - | - | - | - | - | - | - |
$1,997 70,340 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $4,974 Cost: $6,400 |
- | - | $(-3,387) | (-962) | $8,361 | 962 | - | - | - | - | - | - |
- - kWh |
$(-3,387) (-962) MMBtu |
$8,361 962 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,844 Cost: $390 |
- | - | $3,844 | 1,092 | - | - | - | - | - | - | - | - |
- - kWh |
$3,844 1,092 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $947 Cost: $616 |
- | - | $947 | 299 | - | - | - | - | - | - | - | - |
- - kWh |
$947 299 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $740 Cost: $420 |
$740 | 26,084 | - | - | - | - | - | - | - | - | - | - |
$740 26,084 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $1,619 Cost: $3,500 |
- | - | $1,619 | 460 | - | - | - | - | - | - | - | - |
- - kWh |
$1,619 460 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $1,854 Cost: $1,075 |
- | - | - | - | - | - | $1,854 | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$1,854 - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $49,719 Cost: $11,000 |
- | - | - | - | - | - | - | - | $49,719 | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
$49,719 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $22,950 Cost: - |
- | - | - | - | - | - | - | - | - | - | $22,950 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
$22,950 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $91,943 Cost: $24,853 |
$6,036 | 212,778 | $3,023 | 889 | $8,361 | 962 | $1,854 | - | $49,719 | - | $22,950 | - | $6,036 212,778 kWh |
$3,023 889 MMBtu |
$8,361 962 MMBtu |
$1,854 - Tgal |
$49,719 - lb |
$22,950 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $81,625 Cost: $13,887 |
$3,258 | 114,889 | $3,844 | 1,092 | - | - | $1,854 | - | $49,719 | - | $22,950 | - | $3,258 114,889 kWh |
$3,844 1,092 MMBtu |
- - MMBtu |
$1,854 - Tgal |
$49,719 - lb |
$22,950 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | LPG | Water Disposal | Solid Waste (non-haz) | Primary Product | Electricity Usage | Natural Gas | LPG | Water Disposal | Solid Waste (non-haz) | Primary Product |