Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1999 |
Principal Product | PVC and Polythene pipes |
NAICS | n/a |
SIC | 3084 - Plastics Pipe |
Sales | $10,000,000-$50,000,000 |
# of Employees | 94 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 265,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $700,307 | 17,256,155 | kWh | $0.04 |
Electricity Demand | $229,821 | 27,751 | kW-months/year | $8.28 |
Natural Gas | $84,123 | 32,494 | MMBtu | $2.59 |
TOTAL ENERGY COSTS | $1,014,251 | |||
RECOMMENDED SAVINGS* | $74,923 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,419 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,350 Cost: $100 |
$3,350 | 122,802 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,350 122,802 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,484 Cost: $45 |
$7,484 | 274,326 | - | - | - | - | - | - | - | - | - | - | - | - |
$7,484 274,326 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $9,469 Cost: $4,300 |
- | - | - | - | - | - | $9,469 | 3,520 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$9,469 3,520 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $1,874 Cost: - |
- | - | - | - | $1,874 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,874 - $ |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $923 Cost: $1,250 |
$923 | 33,705 | - | - | - | - | - | - | - | - | - | - | - | - |
$923 33,705 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,680 Cost: $6,918 |
- | - | - | - | $2,680 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,680 - $ |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,220 Cost: $360 |
$2,220 | 81,477 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,220 81,477 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $12,420 Cost: - |
- | - | $12,420 | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$12,420 - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $7,875 Cost: $65 |
- | - | - | - | - | - | - | - | - | - | $7,875 | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
$7,875 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $11,628 Cost: $12,888 |
- | - | - | - | - | - | - | - | $11,628 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$11,628 - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $15,000 Cost: $3,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $15,000 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - lb |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $74,923 Cost: $28,926 |
$13,977 | 512,310 | $12,420 | - | $4,554 | - | $9,469 | 3,520 | $11,628 | - | $7,875 | - | $15,000 | - | $13,977 512,310 kWh |
$12,420 - kW-months/year |
$4,554 - $ |
$9,469 3,520 MMBtu |
$11,628 - Tgal |
$7,875 - lb |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,419 Cost: $7,443 |
$5,570 | 204,279 | $12,420 | - | $4,554 | - | - | - | - | - | $7,875 | - | - | - | $5,570 204,279 kWh |
$12,420 - kW-months/year |
$4,554 - $ |
- - MMBtu |
- - Tgal |
$7,875 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes |