IAC Assessment: WV0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1999
Principal Product Bent and flat fabricated glass
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 110,000
Annual Production 2,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,475 3,679,660 kWh $0.04
Electricity Demand $140,295 14,901 kW-months/year $9.42
Electricity Fees $(-7,140) - $ -
Natural Gas $115,191 22,872 MMBtu $5.04
TOTAL ENERGY COSTS $405,821
RECOMMENDED SAVINGS* $162,022 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $102,451
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,196
Cost:
$12,350
- - - - $3,196 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,196
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$6,652
Cost:
$4,300
- - - - - - $6,652 1,320 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,652
1,320
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$600
Cost:
$1,290
- - - - - - $600 50 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$600
50
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$24,192
Cost:
$5,439
- - - - - - $24,192 4,800 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$24,192
4,800
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.7122 DISCONNECT BALLASTS Savings:
$203
Cost:
$80
$203 4,982 - - - - - - - - - - - - $203
4,982
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$36
Cost:
-
$36 879 - - - - - - - - - - - - $36
879
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$730
Cost:
$198
$730 17,878 - - - - - - - - - - - - $730
17,878
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$54,120
Cost:
-
- - $54,120 5,280 - - - - - - - - - - -
-
kWh
$54,120
5,280
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$168
Cost:
$25
$168 4,103 - - - - - - - - - - - - $168
4,103
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
10: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$7,120
Cost:
$1,260
- - - - - - - - - - $7,120 80,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$7,120
80,000
lb
-
-
$
11: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$40,226
Cost:
$12,000
- - - - - - - - $40,226 4,400,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$40,226
4,400,000
gal
-
-
lb
-
-
$
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,840
Cost:
$1,260
- - - - - - - - - - $3,840 12,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$3,840
12,000
lb
-
-
$
13: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,999
Cost:
$11,000
- - - - - - - - - - $7,999 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$7,999
-
lb
-
-
$
14: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$6,940
Cost:
$1,800
- - - - - - - - - - $6,940 70,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$6,940
70,000
lb
-
-
$
15: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$6,000
Cost:
$1,050
- - - - - - - - - - - - $6,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
$6,000
-
$
TOTAL RECOMMENDED Savings:
$162,022
Cost:
$52,052
$1,137 27,842 $54,120 5,280 $3,196 - $31,444 6,170 $40,226 4,400,000 $25,899 162,000 $6,000 - $1,137
27,842
kWh
$54,120
5,280
kW-months/year
$3,196
-
$
$31,444
6,170
MMBtu
$40,226
4,400,000
gal
$25,899
162,000
lb
$6,000
-
$
TOTAL IMPLEMENTED Savings:
$102,451
Cost:
$10,889
$239 5,861 $54,120 5,280 - - $24,192 4,800 - - $17,900 162,000 $6,000 - $239
5,861
kWh
$54,120
5,280
kW-months/year
-
-
$
$24,192
4,800
MMBtu
-
-
gal
$17,900
162,000
lb
$6,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes