Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1999 |
Principal Product | Aircraft subassemblies |
NAICS | n/a |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 84 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 4,500 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $41,057 | 665,006 | kWh | $0.06 |
Natural Gas | $27,919 | 3,823 | MMBtu | $7.30 |
TOTAL ENERGY COSTS | $68,976 | |||
RECOMMENDED SAVINGS* | $23,619 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,581 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $51 Cost: $140 |
$51 | 4,982 | - | - | - | - | - | - | - | - |
$51 4,982 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,494 Cost: $4,830 |
- | - | $1,494 | 205 | - | - | - | - | - | - |
- - kWh |
$1,494 205 MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $3,202 Cost: $9,072 |
$3,202 | 51,876 | - | - | - | - | - | - | - | - |
$3,202 51,876 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,682 Cost: $2,520 |
$1,682 | 27,257 | - | - | - | - | - | - | - | - |
$1,682 27,257 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $90 Cost: - |
$90 | 1,465 | - | - | - | - | - | - | - | - |
$90 1,465 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $1,160 Cost: $2,730 |
- | - | $1,160 | 159 | - | - | - | - | - | - |
- - kWh |
$1,160 159 MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $182 Cost: $600 |
- | - | $182 | 25 | - | - | - | - | - | - |
- - kWh |
$182 25 MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $5,510 Cost: $1,440 |
- | - | - | - | $5,510 | 10,000 | - | - | - | - |
- - kWh |
- - MMBtu |
$5,510 10,000 lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $48 Cost: - |
- | - | - | - | - | - | $48 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$48 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $10,200 Cost: $2,100 |
- | - | - | - | - | - | - | - | $10,200 | - |
- - kWh |
- - MMBtu |
- - lb |
- - lb |
$10,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,619 Cost: $23,432 |
$5,025 | 85,580 | $2,836 | 389 | $5,510 | 10,000 | $48 | - | $10,200 | - | $5,025 85,580 kWh |
$2,836 389 MMBtu |
$5,510 10,000 lb |
$48 - lb |
$10,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,581 Cost: $6,200 |
$1,823 | 33,704 | - | - | $5,510 | 10,000 | $48 | - | $10,200 | - | $1,823 33,704 kWh |
- - MMBtu |
$5,510 10,000 lb |
$48 - lb |
$10,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | One-time Revenue or Avoided Cost |